Laserfiche WebLink
Project Costs <br /> <br />The following summary of project costs for Basic Services Tasks outlined in your <br />RFP dated June 12, 1992. <br /> <br />Payment for the tasks listed below is proposed to be on the basis of hour]y charges <br />for the personnel engaged in the work and for reimbursement of expenses and <br />reproduction costs with the following not-to-exceed costs: <br /> <br />Preliminary Review <br />Plans, Specifications, and Bid Documents <br />Contract Administration <br /> <br />Total Basic Engineering Services <br /> <br /> $1,450 <br />$12,646 <br /> $4,318 <br /> <br />$18,414 <br /> <br />In addition, the following is a listing of the additional engineering services outlined <br />in your RFP. The costs listed below are estimated only and do not constitute a not- <br />to-exceed figure. They are based on a 3-month construction phase. The actual <br />length of the construction phase is dependent on the contractor's operations. <br /> <br />Construction Inspection <br />Construction Stnl~ing <br /> <br />400 hours <br />60 hours <br /> <br />The following pages list the project tasks, projected person-hours of effort for each, <br />and corresponding costs. Also included is a model contract we will propose to use. <br />Hourly charges for personnel involved will be in accordance with the following: <br /> <br />Classification <br /> <br />Ronge of Hourly Billing Rates <br /> <br />Senior Registered Engineer or Architect <br />Senior Non-Registered Designer <br />Registered Engineer, Architect or Land Surveyor <br />Senior Technician or Drafter <br />Graduate Engineer, Architect or Planner <br />Technician or Drafter <br /> <br />$66.00 to $97.00 <br />$57.00 to $87.00 <br />$41.00 to $72.00 <br />$38.00 to $69.00 <br />$27.00 to $60.00 <br />$16.00 to $44.00 <br /> <br /> <br />