My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/11/1992
Ramsey
>
Public
>
Agendas
>
Council
>
1992
>
Agenda - Council - 06/11/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:00:40 AM
Creation date
2/25/2004 1:02:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/11/1992
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven J. Jankowski, P.E. <br />March 5, 1992 <br />Page 2 <br /> <br />POST CONSTRUCTION SERVICES <br /> <br />Our scope of services will include preparation of "Record Drawings" <br />preparation of submittals and documentation necessary to secure MSA <br />funding. <br /> <br />Estimated manhours = 40 manhours <br /> Not-to-exceed <br /> <br />$2,600.00 <br /> <br />Construction staking services would be provided on an hourly basis. The <br />estimated number of crew hours for construction staking is estimated to be <br />110 crew hours. This estimate does not include locating the horizontal control <br />and the front lot corners. Our hourly rate for a 2-man survey crew is $80.00 <br />per hour. <br /> <br />An additional service that is available at your request is full-time <br />construction inspection. Our hourly rate for construction inspection services <br />is $50.00 per hour. The estimated number of hours required for an inspector <br />is 240 hours assuming an eight week construction period. If an inspector is <br />used on this project, then the construction administration cost would be <br />reduced due to less site visits required by the project engineer. <br /> <br />The estimates provided in this proposal assume an eight (8) week construction <br />period working 40 hours per week. The following is our estimated schedule <br />for this project. <br /> <br />July 1, 1992 <br /> <br />August 1, 1992 <br /> <br />August 1, 1992 <br /> <br />August ll, 1992 <br /> <br />September 2, 1992 <br /> <br />September 8, 1992 <br /> <br />September 15, 1992 <br /> <br />November 20, 1992 <br /> <br />Receive authorization to begin work. <br /> <br />Plans and specification completed. <br /> <br />Submit plans and specification to appropriate <br />agencies for review and permits. <br /> <br />City Council approves plans and <br />specification; authorization to advertise. <br /> <br />Bid opening. <br /> <br />City Council awards project. <br /> <br />Begin construction. <br /> <br />Complete construction. <br /> <br />Given the time requirements to obtain permits from the DNR, watershed <br />district and other various agencies, the above time schedule is ambitious but <br />attainable. Weather in the fall will have a significant impact on the <br />construction schedule and our costs. <br /> <br /> <br />