Laserfiche WebLink
CO1¢' .TY OF ANOKA <br /> Paul K. Ruud. Highway Engineer <br />1440 BUNKER LAKE BLVD NW, ANDOVER, I~IINNESOTA 55304 612-754-3520 <br /> <br /> I <br /> I <br />I <br />:1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />April 17, 1992 <br /> <br />City o~ Rare'Icy <br />15153 N0wtlien Boulevard NW <br />Rams~Y,i 1~ 55303 <br />Attn: Sylvi~ Frolik <br /> <br /> P!teliminary Plat <br />Re: ~eise~er's 2nd Addition <br /> <br />Dear Syl~a, ~, <br />We haveirev~ewed the preliminary plat of Fleiseher's 2nd Addition to be located north <br />and east bf C ;AH No. 5 (NowthenBlvd. NW) at 147th Lane NW within the City of <br />Ramsey, ~d filer the following comments: <br /> <br /> R~ghLof-way depicted along CSAH No. 5 is acceptable as shown (60 ft. <br /> either !Side of eenterline). Access for all lots within the plat must be made from <br /> th~ cily streets, and right of access along CSAH No. 5 should be dedicated to <br /> ~ok~i County. <br /> pS~e is within the jurisdiction of the Lower Rum River Watershed District. <br /> e~ coordination between the Watershed District, the developer a. nd the <br /> Ci~ 0f Ramsey should be made to ensure ttmt impacts are minimizect. <br /> <br /> .~.C~,culfations must be provided which show that any drainage to the county <br /> h~i/[ll_ w, ay ditch along CSAH No. 5 does not exceed the pre-existing conditions. If <br /> dr~inai~e from this development to the county highway ditch will exceed the <br /> cuf'ren~ conditions, an alternate drainage plan must be sought. <br /> It~pp~ars that sight distance requirements for cases I, III, IV and V will be met <br /> f0~theICSAH No. 5 intersections at Sunfish Lake Drive and 147th Ave. NW. <br /> Fit ~ve~er, I am enclosing a portion of the Mn/DOT De.~ign Manual which <br /> de' ~lS ~e sight distance criteria for your information and use. The City of <br /> R~'ruseY and the developer should ensure that these requirements are met <br /> th~ bug~ the construction of the new city streets. <br /> <br /> 6I e '.rn!i~'t for work within the county right-or-way is required and must be <br /> obi. xin~d prior to the commencement of construction. Contact Roy Humbert, <br /> Coiatra~'ts Administrator for the Anoka County Highway Department for further <br /> irif6rrn~ttion regarding the permit process. The City of Ramsey should contact <br /> hie/when construction of the new city streets is near completion, so that stop sign <br /> ins. allations along CSAH No. 5 can be coordinated. <br /> <br /> i ~ffirmatlve ~ction / Equal Opportunity Employer <br /> <br /> <br />