My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/1992
Ramsey
>
Public
>
Agendas
>
Council
>
1992
>
Agenda - Council - 03/24/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 4:20:45 PM
Creation date
2/25/2004 3:00:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mc~ombs Frank Roos Associates. inc. <br /> <br />March 5, 1992 <br /> <br />Mr. Steven J. Jankowski, P.E., City Engineer <br />City of Ramsey <br />15153 Nowthen Boulevard Northwest <br />Ramsey, Minnesota 55303 <br /> <br />SUBJECT: <br /> <br />Engineering Proposal <br />Wood Pond Hills Subdivision <br />M?RA #3-09999 <br /> <br />Dear Mr. Jankowski: <br /> <br /> McCombs Frank Roos Associates, Inc. is very interested in providing <br />services for the City of Ramsey and appreciates the opportunity to submit a <br />proposal on the above referenced project. We have thoroughly reviewed the <br />scope of the project, site topography and pertinent design data. We feel the <br />following estimate of manhours and cost limits are adequate for the level of <br />service the City needs to assure quality infrastructure improvements. <br /> <br />i. BASIC ENGINEERING SERVICES <br /> <br />Preparation of Project Feasibility Study - MFRA places high <br />emphasis on the Feasibility Study because it is the basis on <br />which the Council will make important financial decisions. We <br />thoroughly research all details and strive for a high level of <br />accuracy in making cost estimates. <br /> <br />Preliminary Design <br />Construction Cost Estimates <br />Non Construction Project Costs <br />Funding Policies <br />Report & Presentation <br /> <br />16 hours <br /> 8 hours <br /> 4 hours <br /> 4 hours <br /> 10 hours <br /> <br /> 32 hours <br />CNTE $ 2,325.00 <br /> <br />Plans, Specifications and Bid Documents - We have reviewed the <br />plan documents presently used by the City. Our costs are for our <br />typical product, which will meet or exceed the standard plans now <br />used. <br /> <br />Final Design <br />Drafting <br />Specifications <br />Bid Documents <br />Permits <br />Funding Submittals <br /> <br /> 80 hours <br />150 hours <br /> aO hours <br /> 40 hours <br /> 36 hours <br /> 36 hours <br /> <br />~2 hours <br />C~TE <br /> <br />$21,0t0.00 <br /> <br />An ,Couai OpDDrlumt', Empioyer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.