Laserfiche WebLink
P. roject Costs <br /> <br />The following is a summary of project costs for Basic Services Tasks outlined in your RFP dated <br />February 28, 1992. <br /> <br />Payment for the tasks listed below is proposed to be on the basis of hourly charges for the personnel <br />engaged in the work and for reimbursement of expenses and reproduction costs, with the following <br />not-to-exceed costs: <br /> <br />Feasibility Study <br />Plans, Specifications and Bid Documents <br />Contract Administration <br />Post Construction <br /> <br />$5,120.00 <br />18,398.00 <br />5,208.00 <br />~38.00 <br /> <br />Total Basic Engineering Services <br /> <br />$29,464.00 <br /> <br />In addition, the following is a listing of the additional engineering services outlined in your RFP. <br />The costs listed below are estimated only and do not constitute a not-to-exceed figure. They are <br />based on a 3-month construction phase. The actual length of the construction phase is dependent on <br />the contractor's operations. <br /> <br />Construction Inspection <br /> <br />$22,155.00 <br /> <br />Construction Staking <br /> <br />$3,887.00 <br /> <br />The following pages list the project tasks, projected person-hours of effort for each, and <br />corresponding costs. Also included is a model contract we would prol~se to use. Hourly charges for <br />personnel 5nvolved will be in accordance with the following: <br /> <br />Classification <br /> <br />Senior Registered Engineer or Architect <br />Senior Non-Registered Designer <br />Registered Engineer, Architect or Land Sur~eyor <br />Semor Teclmician or Drafter <br />Graduate Engineer, Architect or Planner <br />Technician or Drafter <br /> <br />Range of <br />Hourly Billing t~ates <br /> <br />$66.00 to $97.00 <br />$57.00 to $87.00 <br />$41.00 to $72.00 <br />$38.00 to $69.00 <br />$27.00 to $60.00 <br />$16.00 to $44.00 <br /> <br /> <br />