My WebLink
|
Help
|
About
|
Sign Out
Home
08/04/92
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1992
>
08/04/92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 11:54:26 AM
Creation date
3/1/2004 11:00:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
08/04/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R QU <br />ADDITIi <br /> <br />CASE # 1 <br /> <br />FOR SKETCH PLAN REVIEW OF BURY AND CARLSON <br />)N,,A MINOR SUBDIVISION; CASE OF BURY AND CARLSON <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Backgroundi <br /> <br />Bury and CarlsOn is requesting sketch plan review of a minor subidivison in the Business <br />Wm:ehouse DiStriCt. The area to be platted is approximate}y 17 acres and consists of two metes and <br />bounds descri~edliParcels and Outlot A of Gateway North Industrial Park. The property would be. <br />platted into ofl, e l,Ot~ and if approved, Bury and Carlson is proposing to establish their cement and <br />asphalt rubble' pffo~essing facility on the site. Bury and Carlson are also proposing to acquire <br />Outlots B and ~ ~fiGateway North Industrial Park, but these properties will not be brought into the <br />plat, <br /> <br />The following~items are enclosed for your review: <br /> <br /> a) ~ $ilre location map <br /> b) ::ProPosed sketch plan <br /> c) Cii~ Staff review letter dated July 16, 1992 <br /> <br />Observations: ' <br /> <br />The proposed ~ot in the plat meets the minimum area and dimension requirements for the Business <br />Warehouse D~:sffifit. No construction of roads inter/or to the plat are required. The one lot in the <br />plat will receJbe~;access from Jaspar Street N.W. The ponding area on the plat proposed to be <br />designated as ~utli~t A should be changed to 'drainage easement'. <br /> <br />Three sides 6f the old Foster cemetery are encompassed by the plat and the City should be <br />provided access ~tb the cemetery. It is also reasonable to expect that 143rd Avenue would be <br />extended to tile e~st at some point in the future. City Staff review letter dated July 16, 1992, <br />includes recorkm~ndations for a 33 foot wide ouflot along the northern boundary of the plat and an <br />easement fro~ th~inortheast comer of the plat south to the cemetery to provide the City with access <br />to the cemetery..It is proposed that the development agreement for the plat will require the <br />developer to 'deecl~ ithe outlot along the northern boundary of the plat, at no expense, to the City at <br />such time as ','.a becomes necessary to extend 143rd. In the interim, an easement along the outlot <br />and the easemZ, nt!from the northeast corner of the plat south to the cemetery will provide the access <br />to that cemet~.. <br /> <br />Although Ou~otB, Gateway North Industrial Park will not be brought into the plat, it is apparent <br />that it was plated gs such to provide a link in the planned collector street connectin~ Sunfish Lake <br />Blvd. N.W. ~d ~amsey Blvd. N.W. <br /> <br />Recommendation: <br /> <br /> Commission Action: <br /> <br /> Modoh to:: <br /> Recommend that City Council ~ant final plat approval to Bur,',, and Carlson Addition, a <br /> minor;Subdivision. <br /> <br />Review Checklist: <br /> <br />8/4192 <br /> <br />City Administrator <br />City Engineer <br />Zoning Administrator <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.