Laserfiche WebLink
10. Street Lights. After <br /> Electric Coo~ <br /> electrical set <br /> place within <br /> street light c( <br /> be constructl;. <br /> cost of purch~ <br /> operation and <br /> included within the <br /> as a Stage I Imf <br /> <br />Stage Il Improvements. <br /> <br />1. Street Striping A <br /> street, the owner or <br /> traffic signs as requ <br /> shall be completed c <br /> industrial streets as r, <br /> be completed after se <br /> <br />2. Street Sweeping. <br /> consa'uction, i <br /> <br />3. Sidewalk. <br /> developer or s <br /> plans and spex <br /> <br />4. Seaicoating. <br /> <br />§ 9.50.30 <br /> <br />I <br /> I <br /> I <br /> ! <br /> I <br /> <br />consultation with Anoka <br /> <br /> Cooperative or other provider of <br /> services, the City Engineer shall <br /> within the development agreement, a <br /> street light construction plan which will then <br /> be constructed as a Stage I Improvement, the <br /> cost of purchase, installation and three year's <br /> maintenance thereof being <br /> development agreement <br /> as a Stage I Improvement. <br /> <br /> Street Striping And Signing. Upon completion of the <br /> street, the owner or developer shall install all street signs and <br /> traffic signs as required by the City Engineer. Street striping <br /> shall be completed on all major thoroughfares, commercial and <br /> industrial streets as required by the City Engineer. Striping shall <br /> be completed after sealcoating is done. <br /> <br /> Following the completion of all <br /> consa'uction, the developer or subdivider shall sweep the streets. <br /> <br /> In areas as required by the City Council, the <br /> developer or subdivider shall install sidewalk in accordance with <br /> plans and specifications approved by the City Engineer. <br /> <br /> Within two years after the construction of the <br /> streets, the developer or subdivider shall' sealcoat the streets in <br /> accordance with City specifications. The time schedule on <br /> sealcoating may be extended by the City if less than 50% of the <br /> lots within the Subdivision have been developed. <br /> <br /> Adjusting Water Shut-Off Boxes. The water shut-off <br /> boxes shall be adjusted at the time the final boulevard grade is <br /> established. The water shut-off boxes shall remain visible after <br /> the boulevard sod is installed. <br /> <br />. 6. Boulevard Sodding. This item shall be completed just prior <br /> to occupancy of the building. This item may be completed <br /> sooner provided the developer or subdivider maintain the sod <br /> until the dwelling or structure is occupied. <br /> <br /> 7. Maintenance of Storm Water Sewer and Facilities. <br /> Upon completion of all work within a subdivision, including the <br /> sodding, the developer or subdivider shall clean all storm water <br /> sewers. The developer or subdivider shall also remove silt from <br /> all ponding areas which received runoff from the development <br /> property. <br /> <br /> <br />