My WebLink
|
Help
|
About
|
Sign Out
Home
10/06/92
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1992
>
10/06/92
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 11:30:31 AM
Creation date
3/1/2004 11:17:32 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning & Zoning Commission
Document Date
10/06/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subdivision. Design Standards <br /> <br />§ 9.50.30 <br /> <br />9.50. $ 6 Subsurface conditions. The subdivider shall cause tests to be made of <br />subsurface conditions to determine the nature and extent of subsurface soil, rock and water. <br />The location and results of said tests shall be made available to the City. <br /> <br />9.50.57 Sidewalks and pedestrian ways. All sidewalks and pedestrian ways <br />required by the City shall be constructed of a four inch concrete placed on a four inch (4") <br />gravel base. Grades shall be as approved by the City Engineer. Sidewalks shall be <br />placed in the public right-of-way one foot from the property line and shall be a width <br />designated by the City. <br /> <br />9.50.57a58 Construction definition of trail ways. <br /> <br />All trailways shall be constructed of a two inch (2") <br />bituminous mat on a two Inch (2") gravel base. Grades <br />shall be as approved by the City Engineer. Ail paved <br />trailways shall be of an eight foot 18') width with two <br />foot (2') graded shoulders. <br /> <br />9.50.-r"o-85 9 Public utilities. <br /> <br /> Subdivision 1. In ail residential zoned subdivisions, all telephone, <br />electric and gas service lines shall be placed underground within dedicated public ways or <br />recorded easements in such manner as not to conflict with other underground services. All <br />underground installation of service lines within street right-of-ways shall be completed in a <br />manner which will not disturb street surfacing. Upon completion of the installation of <br />underground service lines in dedicated public ways, a tracing and two copies of plans and <br />specifications showing the completed installation shall be filed with the Zoning Officer. <br /> <br /> Subd. 2. All utility poles, except those providing street lighting, shall be <br />placed in rear lot line easements where feasible. <br /> <br /> Subd. 3. All underground utility service lines, including water, drainage <br />and sanitary sewer systems which traverse private property, shall be installed within <br />recorded easements. <br />9.50.~-960 Trunk storm drainage assessments. In all drainage districts <br />in which the City has installed or is in the process of installing trunk drainage facilities, any <br />Subdivision or resubdivision of any lot or parcel will not be permitted until the subdivider <br />pays or agrees to pay the trunk storm drainage charge. The amount of the storm drainage <br />charge shall be the City's cost of the storm drainage improvement plus an increased amount <br />of inflationary costs as determined by the Construction Cost Index. The initial storm <br />drainage improvement charge shall be set by a separate City Council resolution for each of <br />the City's drainage districts. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.