My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 03/15/2015
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2015
>
Agenda - Economic Development Authority - 03/15/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:57:40 PM
Creation date
3/4/2015 1:41:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
03/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Key Personnel <br />Ross Tillman, P.E. will assist Bryan in completing the analysis efforts. He is experienced in <br />traffic forecasting using multiple methodologies including ITE trip generation manuals and the <br />Metropolitan Council Model. He is also well versed in ITE trip generation and traffic operations <br />and simulation analysis using Synchro, SimTraffic, CORSIM, VISTRO, and VISSIM, along with <br />HCS. He will be involved in the analysis, developing recommendations and writing the formal <br />report. He has completed traffic studies for cities, counties, and MnDOT. He will also direct <br />field data collection efforts that will be essential in evaluating existing conditions and correctly <br />calibrating models. <br />Jason Cook, P.E. will assist Kevin Kielb in preparation of the Feasibility Report. Mr. Cook is a <br />Project Engineer with experience in municipal engineering. Since beginning his career in 2004, <br />he has gained a wide range of experience in project administration from conception through <br />construction. His background includes development and design of municipal reconstruction <br />projects, including street construction, sanitary sewer systems, water distribution systems, storm <br />water collection systems and pedestrian facility construction. His administrative duties have <br />included preliminary engineering reports, preliminary and final design cost estimates, attendance <br />at city council meetings, bidding assistance and construction administration. In addition, Mr. Cook <br />has assisted in training young E.LT.'s on proper construction observation skills and is an expert in <br />water system modeling. <br />Future Business Park RFQ I City of Ramsey, Minnesota 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.