Laserfiche WebLink
Similar Work Experience <br />Business Park, City of Annandale <br />Mark Casey now serves as the City Administrator for the City of St. Anthony Village <br />The City ofAnnandale's existing Business Park had reached its capacity resulting in the need for <br />expansion. The Annandale City Council identified property for the proposed expansion and turned <br />to Bolton & Menk, Inc. their City Engineer to prepare the legal descriptions necessary for the <br />property acquisition. After the property had been acquired, Bolton & Menk prepared preliminary <br />and final plats for the property. As the property was being platted, Bolton & Menk completed a <br />Preliminary Engineering Report for the project. Through that process, Bolton & Menk identified <br />the potential to provide City utilities to the Business Park Expansion area while allowing for <br />the future development of 200 acres of adjacent City property. Through the process, the City of <br />Annandale was able to serve the immediate needs of the Business Park expansion area while <br />planning for the future development of their existing property. Bolton & Menk's planning resulted <br />in reduced capital and maintenance costs for the City into the future. <br />Bolton & Menk, Inc. completed grading, drainage, erosion control, storm water pollution <br />prevention, and utility construction plans for the project and managed the construction through <br />completion. The project included the design and construction of approximately 1,500 feet <br />of bituminous roadway with concrete curb and gutter. The utilities designed and constructed <br />consisted of 12 -inch diameter watermain, hydrants, and 6 -inch industrial services, 8 -inch diameter <br />sanitary sewer mainline with 6 -inch service laterals, and 12 -inch to 27 -inch diameter storm sewer <br />with 12 -inch and 15 -inch services. <br />Marketplace East Industrial Park, City of Big Lake <br />Scott Johnson now serves as the City Administrator for the City of Medina <br />A developer approached the City Council regarding the construction of a private Industrial Park <br />and requested a 429 Financing Agreement. Given the City's financial stake in the project, Bolton <br />& Menk, (the City Engineer) was directed to prepare the plans, <br />specifications, and bidding documents and manage the construction of <br />the project through completion. <br />The project consisted of the design and construction of approximately <br />2,400 feet of bituminous roadway with concrete curb and gutter and <br />sidewalk. The utilities designed and constructed consisted of 12 -inch <br />diameter watermain, hydrants, and 8 -inch industrial services, 10 -inch <br />to 12 -inch diameter sanitary sewer mainline with 6 -inch industrial <br />service laterals, and 12 -inch to 33 -inch diameter storm sewer with <br />12 -inch industrial services. <br />Upon completion of the project, approximately 100 acres had access to City utilities for <br />development. In addition to preparing the construction documents and managing the project, <br />Bolton & Menk, Inc. also prepared assessment rolls and assisted City staff with the assessment <br />process. <br />Future Business Park RFQ I City of Ramsey, Minnesota 12 <br />