My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 03/15/2015
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2015
>
Agenda - Economic Development Authority - 03/15/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:57:40 PM
Creation date
3/4/2015 1:41:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
03/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services <br />We anticipate that the Preliminary Design Layout will include a series of drawings depicting <br />stages of construction /implementation. The Preliminary Design Layout will be included as an <br />attachment to the Feasibility Study. <br />Additional Services <br />Task 1: Storm Water Management Analysis and Plan <br />Base Services <br />The Feasibility Report provided as a part of the base services will include stormwater management <br />concepts that provide a road map that will guide development phasing, including the associated <br />costs for the localized study area. During the feasibility stage, drainage areas will be developed <br />to site localized and regional facilities and to determine trunk storm sewer sizing. Preliminary <br />pond and infrastructure sizing are important at this stage to ensure that stormwater management <br />decisions are technically informed and guidance documents are accurate and sustainable. In turn, <br />Preliminary Design Layouts are developed simultaneously, thereby expediting future construction <br />plan production. <br />Expanded Regional Analysis <br />Development of regional stormwater management in the study area will ultimately include: <br />• Flood control and water quality components to meet local, state, and federal guidelines. <br />• Integration of water resource features that provide an aesthetic function and promote <br />development. <br />• A set of tools to help the City make informed decisions regarding the construction of <br />stormwater infrastructure as development phases occur and how to best utilize the plan to <br />provide incentives for development. <br />• Congruency amongst MS4 permit requirements, City- defined water quality goals and <br />protection of the adjacent water resources. <br />• An updated regional hydraulic model that is seamless integrated into the current SWMP <br />models to maintain the living nature of the plan. <br />• Protection and possibly mitigation of all impacted wetlands. <br />Regional facilities will be located to best suit anticipated development patterns. We will <br />collaborate closely with the City to assemble strategies for assessing developers in a manner that <br />incentivizes development. <br />Future Business Park RFQ I City of Ramsey, Minnesota 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.