My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/02/2015
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2015
>
Agenda - Environmental Policy Board - 03/02/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:01:01 PM
Creation date
3/5/2015 2:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/02/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A —Ordinances <br />Updated Storm Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />19. A dolinoati n f the 1 cati n and am unto f oxcavat d s ils t be st red n <br />the site during construction. <br />20. Any thor inf nnati n pertinent t th particular pr j ct which in th pini n <br />f th insp ct r r applicant is noc s„ary r h 1pful f r th rovi w f tho <br />project. <br />c. It is roc gniz d that n t all typ s f d vol pm nt have th same p tontial f r causing <br />harm t the envir nment; theref re, three classificati ns f devel pment are hereby <br />established: <br />1. C nstructi o f ne new single family h me n a 1 t in a plat. <br />2. C nstructi n f ne new single family h me n a 1 t described by metes and <br />b unds. <br />3. Development on more than one parcel of residential property or any <br />devel pment f c nunercial r industrial pr perty. It is intended that this <br />tw r m re parcels. <br />Classificati n f ¶2 & ¶3 ab ve must pr vide all f the inf rmati n requested in the <br />preceding §9?1.05 subd. Ib. <br />Classification of ¶1 above shall provide a certificate of survey to the Building <br />Inspect r at the time th building permit is applied f r. The Building Insp ct r shall <br />review the lot for which the building permit is requested by reviewing that data <br />cubmitt d f r th nvir nmontal permit f r the plat in which the 1 t is 1 sated. This <br />rovi w shall b mad in rdor t insure that th "Permit Standards" ad ptod h rein <br />consistent with said "Permit Standards". <br />Subd. 5. Expiration, Extension and Revisions <br />u. A permitt shall begin th w rk auth rizod by th permit within 60 days fr m th <br />date f is„uanc f th p rmit unl n a differ nt date f r thc c mmcnc m nt f w rk <br />is s t f rth in the permit. Th permittee shall c mploto the w rk auth rizcd by th <br />permit within the time limit spocifi d in the permit which in n vont shall exceed <br />m ro than 12 m nths fr m the date f i;nuanc . Tho pormitte shall n tify th <br />Z ning Administrat r at 1 ast 21 h urs pri r t th c mm nc mont f w rk. <br />b. Sh uld the w rk n t b c mm need as, sp cificd heroin, th n the permit shall boc m <br />v id. H w v r, if pri r t the date established f r c nun nc mont f w rk th <br />permittee makes written request t the Z ning Administrat r f r an extensi n f time <br />t c mm nc the w rk, setting f rth th rens ns f r thc required xtonsi n fn t <br />greater than ne single year, then the permit shall remain in f rce. <br />Appendix A <br />February 20, 2015March 6, 2015 <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.