My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/02/2015
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2015
>
Agenda - Environmental Policy Board - 03/02/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:01:01 PM
Creation date
3/5/2015 2:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/02/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A —Ordinances <br />Updated Storm Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />(f) The cr s—ings shall b subject t th sit planning requirem ntc set f rth <br />in §9.21.05 subd. lb. <br />3. Utility Substations. Utility substati ns shall bo subject t the f 11 wing <br />standards. <br />(a) All substati ns shall be subject t the site planning requirements set f rth <br />in §9.21.05 subd. lb, and <br />(b) N w substati ns r r furbishmont f existing substati ns shall bo <br />c mpatible in height, scale, building materials, landscaping and signing <br />with the surr unding natural envir nment r land uses. Screening by <br />natural means is enc uraged and sh uld be c mpatible with the <br />surrounding environment. <br />Pip elines. Pipelines and undergr and utility facilities shall be subject t the <br />following standards: <br />(a) All pipelines and underground facilities shall be subject to the site <br />planning requirements set f rth in §9.21.05 subd. 1b; and <br />(b) <br />The facilities shall be 1 cated t av id wetlands, w dlands and areas f <br />unstable soils; and <br />(c) All underground placing of utility facilities and pipelines shall be <br />f 11 w d by rev g tati n and r habilitati n t the c nditi ns which <br />existed on site prior to development. <br />b. Public and Private Roads and Railways. Now r ads and railways cr ring th <br />following standards: <br />1. R ads and railways shall b c nstructod t minimize impacts n the natural <br />terrain and natural landscape. <br />2. Cuts and fills aro t be av id d. <br />3. All r ads and railways shall bo cubj ct t the sit planning requirements set <br />f rth in §9.21.05 subd. lb. <br />�. Now r ads and railways, shall n t utilize th river c rrid r as a c nvoniont <br />right f way f r now art rink r main linos,. <br />5. New r ads and railways shall be restricted t th se facilities needed t access <br />xisting and planned residential, c min rcial and industrial uses. <br />Appendix A <br />February 20, 2015March 6, 2015 <br />Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.