Laserfiche WebLink
Appendix A —Ordinances <br />Updated Storm Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />b. Administrative Rcvicw . The B and shall h ar and docid app als wh r it is all g d <br />ther is 0IT r in any rd r, r quir mcnt, decisi n, r d tenninati n mad by an <br />administrative fficial in th enf rc m nt r administrati n f this S cti n. <br />c. Variances. Th B and may auth rizo up n app al in sp cific cases such r lief r <br />varianc fr m the terms f this S cti n a will n t b c ntrary t th public int rest <br />and my f r th se circumstances such as hardship, practical difficulties r <br />circumstances unique t the pr p rty and r c nsiderati n, a pr vid d f r in th <br />granting f such varianc , the B and f Adjustment shall clearly id ntify in writing <br />the specific c nditi ns that existed c nsistent with the criteria specified in the <br />respective enabling legislati n which justified the granting f the variance. N <br />variance shall have the effect f all wing in any district uses pr hibited in that <br />district, permit a 1 wer degree f fl d pr tecti n than the Regulat ry Fl d <br />Pr tecti n Elevati n f r the particular area, r permit standards 1 wer than th se <br />required by State law. <br />d. Hearings. Up n filing with the B and f Adjustment f an appeal fr m a decisi n <br />rea ; nable time f r a hearing and give due n tice t the parties in interest as specified <br />by law. The Board shall submit by mail to the Commissioner of Natural Resources <br />a c py f the applicati n f r pr p sed variances sufficiently in advances that the <br />Commissioner will receive at least ten days notice of the hearing. <br />e. Decisions. The Board shall arrive at a decision on such appeal or variance within <br />sixty (60) days f th adj urnment f the public hearing. In paering up n an appeal, <br />the Board may, so long as such action is in conformity with the provisions of this <br />Socti n, rev rsc r affirm, wh lly r in part, r m dify the rdor, r quir ment, <br />decisi n r detcrminati n f the Z ning Administrat r r ther public fficial. It <br />shall make its decision in writing setting forth the findings of fact and the reasons for <br />and safeguards such as those specified in §9.2).10 Subd. 'If, which are in conformity <br />with the purp ses f this S cti n. Vi lati ns f such c nditi ns and safeguards, <br />whcn made a part f th terms under which the varianc is granted, shall be doom d <br />a vi lati n f this Socti n punishable and r §9.22.12. A c py f all d cisi ns <br />granting variances shall be f rward d by mail t th C mmis i ncr f Natural <br />Resources within 10 days of such action. <br />f. Appeals. Appeals fr m any decisi n f th B and may be mad , and a specified in <br />9.03.07 f the Ramsey City C do and Minns to Statut s. <br />g. Flood Insurance Notice and Record Keeping. Tho Z ning Administrat r shall <br />notify the applicant for a variance that: <br />1) Th is„uance f a varianc t c nstruct a structure bol w the base fl d level will <br />result in increased premium rates f r fl d insurance up t am tints as high as $25 <br />for $100 of insurance coverage; and <br />Appendix A <br />February 20, 2015March 6, 2015 <br />Page 45 <br />