My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/02/2015
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2015
>
Agenda - Environmental Policy Board - 03/02/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:01:01 PM
Creation date
3/5/2015 2:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/02/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated Storm Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />incorporated into the upstream development where possible. The recommended <br />ordinance changes should help ensure that this occurs. <br />Figures 21 & 22 — TROTT Watershed <br />This watershed is unique in that the majority of the area is currently designed as low <br />impact development. The general nature of the Trott Brook watershed is that it is a linear <br />wetland. The majority of the ponds are functioning well. City staff has noted that one <br />area, near 179th Avenue and Azurite Street is a problem area (Figure 9). This area is also <br />highlighted as a potential threat to structures in Figure 21. Regrading the roadside <br />ditches or constructing a new outfall to relieve this area is recommended to alleviate the <br />problem flooding in this area. <br />The remaining red highlighted pond and the only yellow highlighted pond in TROTT <br />Watershed are infiltration areas with no historic complaints of flooding in the vicinity. <br />Because our model conservatively assumes no infiltration, any threat of flooding from <br />this pond may be exaggerated. If infiltration is not resolving the problem, the emergency <br />overflow from this area should be regraded to protect the structures in the area. <br />Figures 23 & 24 — WMISS Watershed <br />This watershed includes the RTC area which will function well when the south storm <br />sewer outfall is constructed. However, some ponds are indicated as being a threat. To <br />ensure that this does not become a problem, we recommend using the SSA model to <br />correct these potential problems as future expansion of the RTC area occurs. The <br />residential area to the northwest has several ponds that should be reviewed with the same <br />considerations as the Trott and Ditch 43 watersheds. <br />Pond number P17306, located immediately west of 156th and Nutria, shows as a potential <br />threat to structures and as an area of property owner complaints. This appears to be a <br />land locked infiltration pond that has very little infiltration capacity. The best solution to <br />this pond is to provide an outfall to the west. <br />Pond P21210 -E, immediately south of 151' Avenue and east of Rhinestone Street, is also <br />shown as flooded. This is also an isolated infiltration with no outlet. The property <br />owners in the vicinity of this pond have filed complaints of nuisance flooding in this area. <br />Solutions for this pond include: <br />• Expanding the storage and working the pond invert to encourage infiltration <br />• Regrading to lower the existing emergency overflow channel <br />• Constructing a new piped outfall to serve the area. <br />There are two infiltration basins in the mid -eastern part of the watershed (Section 21 near <br />162nd Avenue and Zirconium Street that have been modeled to be either using the <br />emergency spillway or a potential threat to structures. Although the peak elevation of <br />these ponds may be exaggerated by neglecting infiltration in our model, nuisance <br />flooding has been reported in the vicinity by area residents as shown in Figure 9. To <br />alleviate this problem in Pond P21208, we recommend constructing an outlet culvert <br />outlet under 161` Avenue may adequately address the problem flooding experienced <br />there. The problem in Pond P21210, which is upstream from the residential nuisance <br />flooding area, may be corrected by either expanding the infiltration basin storage or by <br />regrading the emergency overflow spillway at a lower elevation to alleviate the potential <br />flooding threat. <br />Section X <br />February 20, 2015March 6, 2015 Page 68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.