My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/02/2015
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2015
>
Agenda - Environmental Policy Board - 03/02/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:01:01 PM
Creation date
3/5/2015 2:19:10 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/02/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated Storm Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />Runoff Conveyance: Methods for safely conveying runoff to a BMP to minimize <br />disruption of the stream network, and promote infiltration or filtering of the runoff. <br />Runoff Pretreatment: Techniques to capture or trap coarse sediments before they enter <br />a BMP to preserve storage volumes or prevent clogging within the BMP. Examples <br />include forebays and micropools for pond BMPs, and plunge pools, grass filter strips and <br />filter fabric for infiltration BMPs. <br />Sand Filter: A technique for treating storm water, whereby the first flush of runoff is <br />diverted into a self-contained bed of sand. The runoff is then strained through the sand, <br />collected in underground pipes and returned back to the stream or channel. <br />Sediment Forebay: A storm water design feature that employs the use of a small <br />settling basin to settle out incoming sediments before they are delivered to a storm water <br />BMP. Often used full in tandem with infiltration devices, wet ponds or marshes. <br />Sequencing: The process used by the Local Government Unit to evaluate the necessity <br />of an activity relative to its impact on a wetland. The party proposing the impact must <br />demonstrate that the activity proposed complies with the following principles in <br />descending order of priority. <br />1. Avoids direct or indirect impacts to the wetlands that may diminish or destroy them; <br />2. Minimizes the impact to the wetland by limiting the degree or magnitude of the <br />wetland activity and its implementation; <br />3. Rectifies the impacts by repairing, rehabilitating, or restoring the affected wetland; <br />4. Reduces or eliminates the impact to the wetland over time by preservation and <br />maintenance operations; and, <br />5. Replaces unavoidable wetland impacts to the wetland by restoring or, if wetland <br />restoration opportunities are not reasonably available, creating substitute wetland <br />areas having equal or greater public value as provided for under the Wetland <br />Conservation Act. <br />Shoreland: Land located within the following distances from public waters: <br />1. One thousand feet from the ordinary high water level of a lake, pond, or flowage <br />2. Three hundred feet from a river or stream, or the landward extent of a floodplain <br />designated by ordinance on a river or stream, whichever is greater. <br />The limits of shoreland may be reduced whenever the waters involved are bounded by <br />topographic divides which extend landward from the waters for lesser distances and when <br />approved by the Commissioner of the DNR. <br />Section XI <br />February 20, 2015March 6, 2015 Page 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.