My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/05/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 02/05/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:29 AM
Creation date
3/9/2015 8:45:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/05/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Further Discussion <br />Matt Wyseth, Tom Tormson and Brian Bryant, Connexus Energy representatives, were available <br />to answer Commission questions. <br />Tom Tormson, Staff Engineer with Connexus, provided background information for the <br />Commission. He stated that Connexus Energy was looking at building a tower to enhance grid <br />automation and communication for their trucks. There has been a consultant recommendation to <br />have a tower at this height and to locate it on Connexus Energy property. There is an existing <br />tower on the property that is taller but is structurally deficient and by law, they cannot add <br />anything to the tower. The 199 foot tower would allow them to get the best possible coverage <br />they can while at the same time staying under 200 feet to avoid FCC regulations/requirements. <br />He also spoke about co -location possibilities. <br />Commissioners asked questions regarding safety and minimizing dead spots, line of sight <br />requirements; location and replacing of the existing tower; safety and setback of the tower; and <br />City ordinance requirements and variances. <br />Community Development Director Gladhill asked if there was any objection before Staff goes <br />forward and works with Connexus Energy on the tower. <br />General board consensus was to go forward on a variance basis. <br />The Planning Commission agreed with the request of Chairperson Levine to address Case 5:06 <br />after Case 5:08. <br />5.07: Review Concept Plan for Old Municipal Center Site as a Single -Family Subdivision; <br />Case of N.I.K. Management, Inc. <br />Presentation <br />Community Development Director Gladhill presented the Staff Report stating the purpose of this <br />case is to review concept plans for a single-family development on the former municipal center <br />campus located at 15153 Nowthen Blvd NW. This is not an official subdivision review. The <br />intent of this case is to provide broad policy direction in preliminary design. As the Planning <br />Commission is aware, the City has been in the process of reviewing appropriate redevelopment <br />scenarios of the former municipal center campus. As an outcome of that process, the City began <br />the process of updating the Comprehensive Plan and Official Zoning Map. The site is still being <br />actively used as Fire Station No. 2. The City is in the process of completing final design of a new <br />Fire Station No. 2 on an adjacent parcel, tentatively scheduled to being construction in Spring, <br />2015. Per City Council direction, the City recently began negotiating a Purchase Agreement with <br />N.I.K. Management, Inc. for a two (2) phase purchase of the site. As part of the negotiation, Staff <br />has been discussing subdivision design with the prospect. At this time, Staff is asking if the <br />Planning Commission/January 8, 2015 <br />Page 9 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.