My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/05/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 02/05/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:29 AM
Creation date
3/9/2015 8:45:12 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/05/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Element #11: REDEVELOPMENT AREAS <br />Desired Outcome: This would be an appropriate chapter to discuss the three (3) small area plans currently <br />under development: <br />1. 167/47 Retail Node <br />2. Future Business Park West of Armstrong <br />3. Old Municipal Center <br />Review of End Product: <br />1. Economic Development Authority <br />2. Planning Commission <br />3. City Council <br />The following are miscellaneous chapters from the 2030 Comprehensive Plan (some of these elements `live' <br />within other elements above): <br />1. Community Identity <br />2. Public Facilities <br />Element #12 (REVIEW OF ELEMENT #3): LAND USE PLAN CHECK-IN #2 (DEVELOP <br />FUTURE LAND USE MAP — THIS WILL BE CONTINUALLY/ITERATIVELY REVIEWED AT <br />EACH STAGE) [Required Element] <br />Desired Outcome: Review and update current Future Land Use Map. NOTE: the City did hold an initial forum <br />in 2014 and as able to gather initial feedback. The City will utilize a variety of forums to seek feedback on this <br />map over the next 12-24 months. <br />The following smaller geographic areas need to be addressed as part of the overall Land Use Plan: <br />• Mississippi River Corridor Critical Area (lMRCCA) <br />• Closed Landfill Land Use Plan <br />• South of Highway 10 <br />• Highway 10 Access Planning Study Impacted Parcels <br />Review of End Product: <br />• Economic Development Authority <br />• Environmental Policy Board <br />• Parks and Recreation Commission <br />• Planning Commission <br />• City Council <br />Modeling `What -I' Scenarios <br />Model alternate forecasts based on the following assumptions (two alternative forecast scenarios): <br />• No improvements to Highway 10 <br />• No solution to groundwater supply issues/surface water supply study <br />
The URL can be used to link to this page
Your browser does not support the video tag.