My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/05/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 03/05/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:35 AM
Creation date
3/9/2015 8:53:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/05/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Associate Planner Gladhill used a map to identify the location and explained the purpose is to <br />provide two points of access, which is important for emergency services. <br />Motion by Councilmember Jeffrey, seconded by Councilmember Strommen, to adopt Resolution <br />#08-08-144 granting final plat approval to TC Trail. <br />Motion carried. Voting Yes: Mayor Gamec, Councilmembers Jeffrey, Strommen, Dehen, Elvig, <br />Look, and Olson. Voting No: None. <br />Case #5: Request for Site Plan Review; Case of Sharp and Associates, LLC <br />Associate Planner Gladhill stated this case deals with the Panther Precision expansion of <br />approximately 2600 sq. ft. addition on Lots 1 and 1A of TC Trail. He stated drainage, grading, <br />and landscape plans are generally acceptable, subject to the staff review letter. He noted the <br />revised plans identify the flag lot and increased landscape requirements have been shifted onto <br />the Outlot to the east, which is City owned property. Associate Planner Gladhill stated setbacks <br />conform and the building is proposed to be constructed of precast rib panels with smooth <br />architectural elements. The Planning Commission met on August 7, 2008 to discuss the site plan <br />and recommended approval. Staff recommends approval conditioned on the staff letter dated <br />August 1, 2008 and revised on August 8, 2008. <br />Mayor Gamec asked if the landscaping would be shifted to the Outlot. <br />Associate Planner Gladhill stated staff is working with the applicant to shift landscaping to the <br />Outlot in order to accommodate the size of facility they want to build. <br />Economic Development Coordinator Sullivan explained that CT Trail wants to make the pond an <br />amenity. The pond configuration has some contour and the intent is to allow them to utilize <br />some trees off site so it looks better. <br />Councilmember Elvig asked staff to describe the property to the south. <br />Economic Development Coordinator Sullivan stated that property is owned by Rotary Systems, <br />another manufacturing company and it fronts on Azurite Street. <br />Councilmember Elvig commented that he did a fair amount of landscaping on his site and <br />described the resulting problems with storage of snow. He noted that snow on the flag lot and <br />roadway will have to be plowed to the south and dumped onto the area of landscaping. He stated <br />his concern whether there is a friendly neighbor to the south that will allow snow to be plowed <br />onto their lot. <br />Mayor Gamec noted there is a large area between the building and Rotary Systems. <br />Associate Planner Gladhill advised that Hakanson Anderson made the flag portion of the lot <br />larger so it could accommodate snow storage. Their engineer felt there would be sufficient width <br />for a blacktop drive plus snow storage. <br />City Council / August 12, 2008 <br />Page 14 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.