Laserfiche WebLink
CONNEXUS' ENERGY <br />,at.r Corrvntrrtty Energy Partner <br />Connexus Energy Communications Tower — City of Ramsey <br />Request for Conditional Use Permit <br />January 30, 2015. <br />This document is hereby submitted to the City of Ramsey in application for and approval of Conditional <br />Use Permit (CUP) for construction of a telecommunications tower on Connexus Energy Headquarters <br />property in the City of Ramsey. <br />Property: <br />Owner: Connexus Energy <br />Address: 14601 Ramsey Blvd, Ramsey, MN 55303 <br />PIN: 27-32-25-23-0004 <br />Legal Description: Section 27 T. 32 R. 25; Lot 1 Block 1 AEC Energy Park <br />Zoning District: E2 <br />Applicant Primary Contact: <br />Tom Guttormson <br />Connexus Energy Principle Technology Engineer <br />Phone: 763-323-2692 <br />Cell: 763-242-0633 <br />Email: tomg@connexusenergy.com <br />Description of Project & Structure <br />The structure will be used to support communications apparatus needed for company operations. <br />Structure design is planned to be a height of 199' (<200') above ground level and will be of monopole <br />design with no supporting guy wires. The proposed placement of the structure is to the east side and to <br />the back of the building adjacent to the building generator and mechanical and electrical facilities. Also <br />included will be a small equipment hut approximately 10'x12' at the base of the tower, to house <br />communications equipment. <br />Timeline <br />The intended timeline for construction of the project is in the 2nd half of 2015, subject to City of Ramsey <br />approvals and permitting. <br />