My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/05/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 03/05/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:35 AM
Creation date
3/9/2015 8:53:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/05/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONNEXUS' ENERGY <br />,at.r Corrvntrrtty Energy Partner <br />Connexus Energy Communications Tower — City of Ramsey <br />Request for Conditional Use Permit <br />January 30, 2015. <br />This document is hereby submitted to the City of Ramsey in application for and approval of Conditional <br />Use Permit (CUP) for construction of a telecommunications tower on Connexus Energy Headquarters <br />property in the City of Ramsey. <br />Property: <br />Owner: Connexus Energy <br />Address: 14601 Ramsey Blvd, Ramsey, MN 55303 <br />PIN: 27-32-25-23-0004 <br />Legal Description: Section 27 T. 32 R. 25; Lot 1 Block 1 AEC Energy Park <br />Zoning District: E2 <br />Applicant Primary Contact: <br />Tom Guttormson <br />Connexus Energy Principle Technology Engineer <br />Phone: 763-323-2692 <br />Cell: 763-242-0633 <br />Email: tomg@connexusenergy.com <br />Description of Project & Structure <br />The structure will be used to support communications apparatus needed for company operations. <br />Structure design is planned to be a height of 199' (<200') above ground level and will be of monopole <br />design with no supporting guy wires. The proposed placement of the structure is to the east side and to <br />the back of the building adjacent to the building generator and mechanical and electrical facilities. Also <br />included will be a small equipment hut approximately 10'x12' at the base of the tower, to house <br />communications equipment. <br />Timeline <br />The intended timeline for construction of the project is in the 2nd half of 2015, subject to City of Ramsey <br />approvals and permitting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.