Laserfiche WebLink
Basis for need <br />Connexus Energy completed a communications study in 2014 to identify solutions for areas of need: <br />1. Resolve issues with current communications systems <br />2. Develop a forward-looking strategy to enable and support forthcoming applications that require <br />additional communications capability. <br />The company's existing tower located in Anoka just off Trunk Highway 10 was determined to be <br />structurally deficient per current codes in a recent analysis. As such, no additional attachments can be <br />added. Existing systems include the company's land mobile radio system (voice communication to <br />trucks and hand held radios), and control and monitoring communications to customer owned <br />Distributed Generation (DG). <br />Looking forward, Connexus Energy plans to add communication infrastructure for "smart grid" <br />applications, including: <br />• AMI - Automated Metering Infrastructure. <br />• DA — (Distribution Automation) communications to devices on the electric grid to enhance grid <br />efficiency and reliability. <br />• SCADA — Communications for monitoring and control of substations. <br />• Demand Response — enables customers to control electrical load to reduce demand and energy <br />consumption during peak periods of use. <br />The proposed communications tower is an integral element of the overall plan. The study indicates the <br />tower is ideally located on Connexus Energy property. <br />Location and Height <br />A tower height of 199 feet (just under 200') above ground level is the ideal height based on the <br />following: <br />• The tower does not need to be painted (red and white) or tamped for heights under 200 feet <br />above ground level per FCC requirements. <br />• Propagation analysis indicates that communications signal performance at 200' at the Ramsey <br />location is comparable to that of the existing 300' height in Anoka. Propagation performance <br />degrades below 200' towards 100'. "Holes" in coverage due to degradation of signal path <br />creates additional safety risk when crews need voice communication working on power lines, <br />and additional reliability risk if signal is lost when performing line switching operations. <br />• The 200' height allows for signal propagation over the Ramsey landfill (^'160') for applications <br />where direct line of site communications is needed. <br />Proposed placement of the structure is to the "back" of the Connexus building, near the generator <br />enclosure and service transformers. Exhibit 2 illustrates the location of the tower on the property with <br />approximate dimensions from the tower base to surrounding property lines. Exhibit 3 illustrates <br />approximate placement in the general back area of the property, with approximate distances from the <br />tower base to the building, the Eastern property edge bordering Cottonwood Park, and to the closet <br />point of the public trail within the park. These exhibits were extracted from the Anoka County GIS base <br />map with the aerial view included. <br />