Laserfiche WebLink
Similar Work Experience <br />In addition to the roadway construction, the project included the extension of trunk sanitary sewer <br />and watermain to service the industrial lots, as well as the construction of a regional storm water <br />detention pond. The project also involved the construction of a large 17 -acre wetland bank. <br />F, . <br />Funding for the project included ATP Federal Aid grants, County State Aid funding, Municipal <br />State Aid funding, City local option sales tax funds, utility enterprise funds, special assessments, <br />and local City and County funds. The project was completed for a cost of $8.5 million, not <br />including the interchange construction. <br />Industrial Park, City of Dawson <br />Bolton & Menk is assisting the City of Dawson, Minnesota with a critical infrastructure project <br />to support current and future growth of the ag- processing cluster currently located in the <br />industrial park. The services Bolton & Menk is providing include coordination with Federal EDA <br />and Minnesota DEED; completing all required Federal EDA engineering reports; conducting <br />preliminary design meetings with the City of Dawson funding agencies and all agencies required <br />to oversee the successful completion of the project; prepare and submit applications, plans and <br />reports to all agencies; attended a mandatory conference with Federal EDA staff along with <br />supporting agencies; attendance at all meetings required to procure approvals; provide revisions <br />to existing drawings as required; provide all inspections full and part-time including site visits by <br />professional engineers; completing preliminary plans and cost estimates; completing final plans, <br />specifications and cost estimates; secure required state and local approvals; completing proposed <br />contract documents for bidding; provide surveillance of project construction to assure compliance <br />with plans, specifications and contract documents. <br />The proposed project consists of improving the infrastructure in the 40 acre existing industrial <br />park and developing a 65 acre industrial park on the east side of CSAH 37. The infrastructure <br />improvements in the existing 40 acre industrial park include grading and finishing two existing <br />gravel roads with curb and gutter, bituminous and storm sewers. In addition to the road <br />improvements, a storm water treatment and rate control for the additional impervious area in west <br />industrial park. The development of the east 65 acres consists of the installation of sanitary sewer <br />collection utilities, industrial waste collection system, water utilities, bituminous roads, curb and <br />gutter, storm sewer conveyance systems and a storm water pond for treatment and rate control. <br />Both the existing and new industrial park roads will also be illuminated. The project is proposed to <br />�qm be funded through a Federal EDA grant in the amount of $1,189,500 and a $500,000 <br />Minnesota DEED grant. The remaining financing will be through the City and private <br />investments. <br />Waterview Business Park, City of Willmar <br />Mel Odens now serves as MnDOT State Aid Engineer for D8 <br />The Waterview Business Park in Willmar, Minnesota was approximately an 85 -acre <br />site that was graded for commercial retail lots. It consists of about 1.2 miles of paved <br />road surface, 2.2 miles of B624 curb and gutter, 6,542 linear feet of sanitary sewer, <br />5,973 linear feet of ductile iron pipe watermain, and 7,202 linear feet of concrete storm <br />sewer pipe. The site utilities were installed from October 2006 to August of 2007. <br />Street work was completed from May of 2007 to June 2008. <br />Future Business Park RFQ I City of Ramsey, Minnesota 14 <br />