My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 02/05/2015
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2015
>
Agenda - Economic Development Authority - 02/05/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:57:56 PM
Creation date
3/9/2015 9:00:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
02/05/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services <br />• Street Lighting <br />• Trunk Water Service <br />• Trunk Sanitary Sewer Service <br />Additionally, the report will account for the following items, which could have an impact on <br />overall project costs: <br />• Private Utilities <br />• State Aid Design and Approval Requirements <br />• Anoka County Design Requirements <br />Task 2.1: Feasibility Report Preparation <br />The Feasibility Report will include the following: <br />• Written discussion of preliminary design findings. <br />• Compilation of preliminary plans developed under separate tasks. <br />• Development of preliminary cost estimates based on estimated quantities from the preliminary <br />layouts and unit prices from bids received for similar projects. <br />• Development a preliminary assessment roll based on the preliminary estimated project costs <br />and the direction of the City Engineer's interpretation and application of the City's Assessment <br />Policy. <br />• Discussion of permit requirements. <br />• Discussion of the project schedule. <br />• Discussion of potential phasing of improvements. <br />The final document will be provided to the City for review and comment. Adjustments to the <br />document will be made based upon comments received and a final version will be provided to the <br />City in hard copy and electronically in PDF format. <br />Preliminary Design Layout <br />Task 1: Preliminary Design <br />Using the base map, results from the Traffic Impact Study and results from additional analysis, we <br />will prepare a Preliminary Layout of desired improvements. <br />Preparation of the Preliminary Design Layout will be performed in coordination with City staff. <br />Major design components of this subtask include the following: <br />• Preliminary design of the roadway alignment, width, and typical section. We understand the <br />roadway alignment will generally match the existing alignment, unless otherwise indicated by <br />City staff. <br />• Preliminary layout of curb. <br />• Preliminary layout (plan view) of water and sanitary sewer trunk facility improvements, <br />including preliminary pipe sizes. <br />• Preliminary layout of storm water management strategies, including pond locations. <br />Future Business Park RFQ I City of Ramsey, Minnesota 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.