Laserfiche WebLink
The draft preliminary bridge plans included in the report may <br />be advanced to a complete preliminary plan for review and <br />approval by the MnDOT Bridge Office Preliminary Plan Review <br />Unit. Upon approval of the preliminary plan, the final design <br />and plans may be prepared and reviewed per the Cooperative <br />Construction Agreement Process. <br />Preparation of funding applications and requests for letters of <br />support may begin at this time while other steps outlined above <br />are on-going. <br />-441 r. �� a � .. .. .. .� <br />I + II 1 I" ; f m, lilli, 1.1111 �:,id �i�"'411 !I��Iullllhl�,,mI IIIIIIInI11lIIli:IIIV�{1 hI1.'rl{,IIS 1'114`?1111Illl II' IIYI11N 1111illllll',IIII <br />Appendix E, Figure 20 - Preferred Concept D View from TH 10 <br />inL11 U I I Ilii i i111111ii IFIL li <br />,.Rm HI <br />II II1001I II <br />Appendix E, Figure 19- Preferred Concept D View of helix structure from the south <br />Appendix E, Figure 18 - Preferred Concept D Bird's eye view <br />December 2014 <br />Mississippi Skyway OverTH10 Preliminary Engineering Report iv <br />