Laserfiche WebLink
Fee Schedule <br />Bolton & Menk, Inc.'s proposed costs for the work summarized within this proposal have been detailed in the table below. <br />Task <br />Hours <br />Fee <br />traffic Impact Stu • ° <br />1.0 Trip Generation <br />60 <br />$6,990 <br />2.0 Future Geometric and Intersection Control Needs <br />72 <br />$8,390 <br />Project/Design Engineer/Planner/Landscape Architect <br />$52-165 <br />Licensed Surveyor <br />1.0 Data Gathering and Review <br />24 <br />$2,500 <br />2.0 Feasibility Report <br />58 <br />$6,800 <br />$72-165 <br />Technician (Inc. Survey') <br />$33-130 <br />1.0 Preliminary Design <br />82 <br />$8,560 <br />$120-215 <br />1.0 Regional Storm Water Management <br />50 <br />$5,620 <br />$5,620 <br />Additional Services Fee <br />Charges are based on hours spent at hourly rates in effect for the individuals performing the work. These rates include <br />labor, general business and other normal and customary expenses associated with operating a professional business. <br />Employee Classification <br />Hourly Billing Rates <br />Sr. Principal Engineer/Surveyor <br />$170-240/Hour <br />Sr. Project Manager - Principal Engineer/Surveyor <br />$127-180 <br />Senior Transportation/Aviation Planner <br />$125-170 <br />Project Manager (Inc. Landscape Architect) <br />$106-165 <br />Project/Design Engineer/Planner/Landscape Architect <br />$52-165 <br />Licensed Surveyor <br />$66-140 <br />Project Surveyor <br />$82-120 <br />Specialist (Nat. Resources; GIS; Traffic; Graphics; Other) <br />$47-130 <br />Senior Technician (Inc. Survey') <br />$72-165 <br />Technician (Inc. Survey') <br />$33-130 <br />Administrative Support & Clerical <br />$29-110 <br />Structural/Electrical/Mechanical/Architect <br />$120-215 <br />Future Business Park RFQ I City of Ramsey, Minnesota 24 <br />