My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:29 PM
Creation date
3/11/2015 8:30:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
583
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LSA Design, Inc. <br />Northwestern Building <br />219 North Second Street <br />Suite 302 <br />Minneapolis, MN 55401 <br />T. 612.339.8729 <br />F 612.339.7433 <br />www.lsadesigninc.com <br />Planning <br />Architecture <br />Urban Design <br />To: Patrick Brama - Economic Development Manager <br />From: William Fossing, PE <br />Project: Ramsey Municipal Parking Facility Enclosure , Project Number 14-28 <br />Subject: Reissued Bidding Results and Recommendations <br />Date: March 2, 2015 <br />We have attached the bid tabulation for the reissued Municipal Parking Ramp Facility <br />Parking Enclosure project which were opened on February 26, 2015. As you are aware this <br />project was issued for bid last fall but not awarded. The low bid was $354,000.00. <br />We made some minor modifications to the Contract Documents to reflect a spring/summer <br />construction schedule and added some bid alternates to maximize the available funds. The <br />Engineer's Estimate was updated in September 2014 to $249,420.00. <br />The low base bid from Constrction Results Corporation is $298,440. The following Add <br />Alternates are available if selected: <br />ADD ALTERNATE #1 (Delete Paint on new walls and add architectural finishes to CIP <br />concrete and CMU walls and pilasters.) <br />(Add the following amount for Alternate #1) $ 28,000.00 <br />ADD ALTERNATE #2 ( Add spray foam insulation to ceiling of enclosed area.) <br />(Add the following amount for Alternate #2) $ 5,000.00 <br />With four qualified General Contractors providing competitive bids, it is our opinion that <br />the low bid represents the current market prices for the reuired labor and material for this <br />project. The buff colored concrete and burnished block would provide a higher level of <br />finish and less maintenance but they add almost $12/ SF. We are recommending moving <br />ahead with the painted finish on the walls. <br />Based on this we recommend the following: <br />• Approve the award of the base bid for $298,440. <br />• Reject Alternate #2 for $28,000. <br />• Approve the award of the Alternate #2 for $5,000. <br />I am available to discuss and to meet with to review this issue as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.