My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:29 PM
Creation date
3/11/2015 8:30:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
583
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DD Level Estimate of Construction Cost for 2014 Construction <br />Q <br />a) <br />N <br />d <br />U <br />W <br />U <br />U <br />C <br />d <br />W <br />E <br />W <br />O <br />W <br />7 <br />N <br />O <br />U <br />W <br />.0 <br />LL <br />Ol <br />C <br />Y <br />R <br />a <br />Q <br />U <br />W <br />N <br />E <br />a) <br />U <br />O <br />d <br />By: William Fossing, PE - LSA Design Inc <br />Total <br />O <br />N. Ln <br />e- <br />03 <br />$ 13,725.00 <br />$ 103,480.00 <br />O <br />Co' <br />M <br />03 <br />$ 48,600.00 <br />$ <br />O <br />0LO <br />(. <br />03 <br />O <br />0 <br />O) <br />N <br />E <br />8,780.00 <br />$ 17,565.00 <br />$ 3,500.00 <br />$ 249,420.00 <br />Units <br />ill <br />0)0) <br />CY <br />LF <br />LF <br />LL <br />0) <br />CY <br />LS <br />LF <br />LF <br />LF <br />LL <br />0) <br />LL <br />J <br />LF <br />SF <br />< (6 <br />W W <br />1.1 <br />(f) <br />LLQLL <br />WWW <br />SF <br />EA <br />LS <br />SF <br />I Quantity <br />55 <br />O <br />CO <br />0 O <br />500 <br />CO <br />CO <br />CO <br />I,- r <br />N N <br />O <br />0 <br />CO <br />LO <br />IH- <br />N <br />175 <br />5,800 <br />r- N- <br />530 <br />5,200 <br />2 <br />5,200 <br />5,200 <br />6 <br />1 <br />5,200 <br />Description <br />Demolition <br />Sawcut, Demo and dispose Bituminous Pavement <br />Demo and Dispose Concrete Sidewalk <br />Sitework / Earthwork / Utilities <br />Footing excavation/ shoring <br />Wet tap WM and install 4" waterline to lower level of stair elevator <br />Add Sanitary Sewer Drain and connect to existing San Sewer <br />Patch Bituminous and Concrete Grade Slab, Add Concrete Apron <br />Concrete Foundations and Concrete and Masonry Walls <br />Concrete column footings <br />door threshold frost footing <br />Precast Concrete Spandrels <br />Precast Concrete Header beam <br />Precast Concrete columns <br />CMU Infill and Pilasters <br />Thermal and Moisture Protection, Doors and Finishes <br />Backer Rod and Sealants <br />Emseal at wall base <br />1-1/2" Spray Insulation on ceiling <br />3' x 7' Door w/ electronic strike <br />Insulated 8' x20' Overhead Door w/ access controls <br />Arch Coating <br />Mechanical <br />Dry Sprinkler, controls and enunciator panel; <br />Reroute Sanitary Risers <br />Mechanical Ventilation and CO detection <br />Electrical <br />20 KW Electric Unit Heater <br />Add Light Fixtures and Exit sign <br />Power and conduit for card reader <br />Add Outlets and Electric Heat Trace to Floor Drain <br />Subtotal <br />Escallation for 2015 Construction <br />Contingency @ 8% <br />Allowance for security and access controls <br />Probable Cost of Construction <br />E <br />O <br />N <br />M <br />V <br />lfl <br />LSA Design Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.