My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:29 PM
Creation date
3/11/2015 8:30:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
583
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Industrial wastewater strength charges will be based on actual or average discharge <br />strength above domestic wastewater strength. <br />• Load charges for septage, portable -toilet waste, holding -tank wastewater and out -of -region <br />wastes will be uniform for each type of load, and based on the volume of the load, the <br />average strength of the types of loads, and the costs of receiving facilities. <br />• Sewer availability charges (SAC) will be uniform within the urban area based on capacity <br />demand classes of customers and the SAC Procedure Manual. Sewer availability charges <br />for a rural center will be based on the reserve capacity and debt service of facilities specific <br />to the rural center. <br />• Other fees recovering costs of specific services may be imposed, as approved by the <br />Council. <br />• Cost-sharing between the Council and a local governmental unit may be used when <br />construction of regional wastewater facilities provides additional local benefits for an <br />incremental increase in costs. <br />• Facilities that are no longer a necessary part of the regional wastewater system will be <br />conveyed to the benefiting local governmental unit, or will be abandoned or sold, pursuant to <br />related statutes. <br />• Seek customer input prior to, and give at least three months notice of, any material changes <br />in the design of charges. <br />• Continue efforts to work to simplify and improve SAC and to communicate to customers. <br />Wastewater System Plan <br />Existing Facilities <br />Regional Wastewater Conveyance and Treatment System <br />The Metropolitan Council provides wastewater collection and treatment services to 2.7 million <br />people in 108 communities, which represents about 95% of the seven -county metropolitan <br />area's population. The regional wastewater system includes eight wastewater treatment plants, <br />60 pump stations, and 610 miles of regional interceptors that convey flow from approximately <br />5,000 miles of local sewers to these treatment plants. <br />The system treats approximately 250 million gallons per day of wastewater from homes, <br />industries, and businesses. The long-term service area map (Appendix F) shows the location of <br />all metropolitan interceptor sewers and wastewater treatment plants in the metro area. Table 1 <br />presents information about the treatment plants. <br />The Council works with more than 800 industrial clients to substantially reduce the amount of <br />pollution entering the wastewater collection system. The Council also accepts septage from <br />private subsurface sewage treatment systems, community and/or cluster systems, biosolids <br />from municipal wastewater plants, and leachate from landfills throughout Minnesota, and other <br />hauled industrial wastewater. Waste haulers pay for the cost of service through various <br />wastewater fees established by the Council. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.