My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:29 PM
Creation date
3/11/2015 8:30:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
583
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northeast Area. The long-term northeast wastewater service area has the potential to generate <br />wastewater flows that slightly exceed the capacity of the interceptors serving this area. Rather <br />than constructing an extensive capacity relief interceptor system, a potentially feasible <br />alternative is to construct a wastewater reclamation plant with groundwater recharge and <br />wastewater reuse. <br />Hastings. A new Hastings Plant is planned to replace the existing plant located near downtown. <br />The new plant will be expandable, with a long-term service area that includes portions of <br />Marshan, Nininger, and Vermillion townships. The plant site has been acquired. <br />Table 3 summarizes the planned capacity of the regional wastewater treatment plants. <br />Table 3. Planned Wastewater Treatment Plant Capacity (million gallons per day) <br />Plant <br />Current Current Flow Planned Planned <br />Capacity Capacity Capacity <br />2040 Long -Term <br />Blue Lake <br />32 27 40 50 <br />Carver County - - 10 <br />Crow River <br />3 8 <br />Eagles Point <br />10 4.4 10 20 <br />East Bethel <br />0.4 new 1.2 2 <br />Empire <br />24 10 24 50 <br />Hastings <br />2.3 1.6 4 10 <br />Metropolitan <br />251 180 251 280 <br />New Germany <br />0.1 0.2 <br />Seneca <br />34 24 34 40 <br />St. Croix Valley <br />4.5 3.0 <br />4.5 4.5 <br />Scott County - - 25 <br />Total <br />358 250 372 500 <br />Service Population <br />2,700,000 3,400,000 6,000,000 <br />Capital Improvement Program <br />Wastewater Flow Projections <br />Sewered population and employment forecasts, and the associated average wastewater flow <br />projections, are shown in Tables 4 and 5 by wastewater treatment plant service area. <br />(Forecasts and projections by community are found in Appendices A-3 and A-4). Wastewater <br />flow projections are based on 60 gallons per day (gpd) per person and 15 gpd per employee <br />from new development, and gradual reduction of wastewater flow from existing development, <br />which reflects water conservation and reduction of inflow and infiltration. <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.