Laserfiche WebLink
4. An assessment of existing or potential water resource -related problems. At a minimum, <br />the plan should include: <br />- A prioritized assessment of the problems related to water quality and quantity in <br />the community. <br />- A list of any impaired waters within their jurisdiction as shown on the current <br />Minnesota Pollution Control Agency (MPCA) 303d Impaired Waters. <br />- If a Watershed Restoration and Protection Strategy (WRAPS) or TMDL study has <br />been completed for the community, the community should include <br />implementation strategies, including funding mechanisms that will allow the <br />community to carry out the recommendations and requirements from the WRAPS <br />or TMDL specific to that community. More information on the MPCA's WRAPS <br />and TMDL programs can be found on the MPCA's web site at <br />www.pca.state.mn.us. <br />- Communities with designated trout streams should identify actions in their plan to <br />address the thermal pollution effects from development. <br />- Communities with special waters, such as outstanding resource value waters, <br />need to meet state requirements for development near these waters <br />5. A local implementation program/plan that includes prioritized nonstructural, <br />programmatic and structural solutions to priority problems identified as part of the <br />assessment completed for number 4, above. Local official controls must be enacted <br />within six months of the approval of the local water plan. The program/plan must: <br />- Include areas and elevations for stormwater storage adequate to meet <br />performance standards or official controls established in the WMO plan(s) <br />- Define water quality protection methods adequate to meet performance <br />standards or official controls. At a minimum, the plan should include: <br />■ Information on the types of best management practices to be used to <br />improve stormwater quality and quantity. (A five-year establishment <br />period is recommended for native plantings and bioengineering <br />practices). <br />■ The maintenance schedule for the best management practices. <br />- Clearly define the responsibilities of the community from that of the WMO(s) for <br />carrying out the implementation components <br />- Describe official controls and any changes to official controls. At a minimum, the <br />plan should include: <br />■ An erosion and sediment control ordinance consistent with NPDES <br />Construction Stormwater permit requirements and other applicable state <br />requirements <br />■ Identify ways to control runoff rates so that land -altering activities do not <br />increase peak stormwater flow from the site for a 24-hour precipitation <br />event with a return frequency of 1 or 2 years. Communities with known <br />flooding issues may want to require rate control for storms with other <br />return frequencies (10 -year, 25 -year or 100 -year) <br />76 <br />