Laserfiche WebLink
Mr. Jack Ippel - 2 - Decembeh 12, 1983 <br /> <br />PHASE Ia <br /> <br />1. ~gency/Project Coordination <br /> <br />$800.00 <br /> <br />2. Inventory <br /> <br />$1,750.00 <br /> <br />A. History of AirpOrt <br />B. Role in Metro Area <br />C. Description of Facilities <br /> l) Review of Existing Conditions <br /> 2) Users View of Facilities <br />D. Historical Activity <br /> 1) Based Aircraft <br /> 2) OperBtions <br /> E. Deficiencies/Limitations of Facilities & Site <br /> F. Aircraft Usage Survey <br /> <br />3. Activities Forecasts (1983-2003) <br /> <br />$1,500.00 <br /> <br />Relationship to MAC System & Metro Region <br />Develop Activities Forecasts <br /> l) Based Aircraft <br /> 2) Operations <br /> 3) Aircraft Mix <br /> <br />4. Facility Requirements <br /> <br />$3,250.00 <br /> <br />Determine Facilities from Forecast & Role for: <br /> A. Airside <br /> 1 ) Runway <br /> 2) Taxiway <br /> 3) Operation Limitations <br /> 4) Approach Aids <br /> 5) Lighting <br /> B. Landside <br /> l) Terminal Ar~a <br /> 2) Airport Access Plan <br /> 3) Aviation Related Business Area <br /> <br />5. Field Data Collection <br /> <br />$6,600.00* <br /> <br />A. Aerial Topography & Site Control <br /> (We have the option of a new topo to be flown in the spring <br /> of 1984 at $4,050.00 or to update the existing topo at $3,000.00.) <br />B. Obstruction Survey <br />C. Soils Report <br />D. Document Utilities <br />E. Prepare Property Map (one sheet) ~ <br /> <br />* Based on ~,pdating existing topo. <br /> <br /> <br />