Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br /> ! <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> ! <br /> I <br /> I <br /> <br />, COUNTY OF ANOKA, <br /> Office of the County Board of Commissioners <br /> <br />COURTHOUSE ANOKA, MINNESOTA 55303 <br /> September 19, 1983 <br /> <br />MEMO TO: Anoka County Board of Comtsstoners <br /> <br />FROM: Commissioner Albert A, Kordiak <br /> <br />5U~ECT: Methane Project Update <br /> <br />Frtday, September 2, 1983, btds were opened for the construction of the <br />landfill gas plpeltne and proposals for the generators and related <br />pumplng equipment. Three bids were recetved for the construction of the <br />pipeline, with the low bld submitted by Minnesota Limited [ncorporated. <br />The btd~ requested three alternates - a three tnch ptpe, four inch and <br />six tnch pipe. Minnesota Ltmtted was low for all three stzes as Indicated <br />in the attached bid tabulation sheet. <br /> <br />Th'roe proposals were received for the generator and related equipment. <br />Because of the technical nature of this equipment, the Landfill Board <br />considered the alternate that Included engine to be cooled by engine <br />mounted radiator - no heat recovery options. Bids are as follows: <br /> <br />Ztegler, Inc. - $149,122,00 - delivery 24-26 weeks <br /> <br />Northern Power Products - $142,186.00 - delivery approximately 20 weeks <br /> <br />Perennial Engineering - <br /> 1. Two 8$KW generators - total price $104,900.00,- delivery 15 <br /> weeks <br /> 2. Two 105KW generators - total price $112,954.00 - delivery, lO <br /> weeks <br /> <br />Barr Engineering and County staff recommended that the Landfill Board <br />enter into negotiations with Perennial Engineering for the purchase of <br />two 105KW generators and related equipment at the proposed price of <br />$112,954.00 and to enter into agreement with Minnesota Limited for the <br />construction of'the st~ inch pipeline at the total cost of $109,450.00. <br /> <br />Barr Engineering'recommended the six,inch pipeline based on its ability <br />to provide sufficient amount of g~s to thme or four companies consuming <br />the amount of power of Waltek wtthout Installing a compressor at the <br />1andft11 which would be more costly. The Landfill Board recommended <br />that Ttm Yantos negotiate with Waltek regarding the difference between <br />the two 85KW generators at $104,900.00 and the two 105KW generators at <br />$112,954.00. Although the project would work with the two 85KW generators~?' <br />we felt that Waltek should have the option to pay the difference;to <br />receive the extra power. <br /> <br />Affirmative Action / Equal Opportunity Employer <br /> <br /> <br />