Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />7) <br /> <br />8) <br /> <br />9) <br /> <br />10) <br /> <br />11) <br /> <br />..*9- <br /> <br />i description of any features, buildings or areas vhich <br />are of historic significance. <br /> <br />A~ap indicating proposed finished grade showing <br />contours at the same intervals as provided above or as <br />required to clearly indicate the relationship of <br />proposed changes to existing topography and remaining <br />features. <br /> <br />A landscape plan dra~n to an appropriate scale, <br />including dimensions and distances and the location, <br />types, size and description of all existing vegetation, <br />clearly locating and describing any vegetation proposed <br />for removal and all proposed landscape materials ~d~ich <br />rill be added to the site as part of the development. <br /> <br />A proposed drainage plan of the developed site <br />delineating in ehich direction, the volume and at vhat <br />rate stotm vater viii be conveyed from the site and <br />setting forth the areas of the site vhere storm vater <br />viii be alloyed to collect and gradually percolate into <br />the ground or be slovly released to stream or lake. The <br />plan shall also set forth hydraulic capacity of all <br />structures to be constructed or existing structures to <br />be utilized, including volume of holding ponds and <br />design storm. <br /> <br />An erosion and sedimentation control plan indicating the <br />type, location and necessary technical information on <br />control measures to be taken both during and after <br />construction, including a statement expressing the <br />calculated anticipated gross soil loss expressed in <br />ton/acre/year both during and after construction. The <br />gross soil loss shall not exceed 5 tons per acre per <br />year during construction or 2 tons per acre per year <br />during construction when the site is adjacent to a water <br />body or water course; and 1/2 ton per acre per year <br />after the construction activities are completed as <br />calculated in accordance with the Uniform Soll Loss <br />Equation. <br /> <br />Wetlands and other natural rater bodies shall not be <br />used as primary sediment traps during or after <br />construction. <br /> <br />A plan of erosion protection measures which shall make <br />maximumuse of ~atural in-place vegetation rather than <br />the placing of new vegetation on site as erosion control <br />facilities. The use of natural erosion control devices <br />shall be preferred to the maximu~ extent over the <br />construction of artificial drainage devices including <br /> <br /> <br />