My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/1983
Ramsey
>
Public
>
Agendas
>
Council
>
1983
>
Agenda - Council - 09/27/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:03:13 PM
Creation date
3/22/2004 10:23:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/1983
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br /> <br />170.0112H <br /> <br />170.0112I <br /> <br />170.01125 <br /> <br />- 12 - <br /> <br />execution of an agreement betveen the City an the developer, <br />require a surety in the for~ of a performance bond, cash <br />escrov or letter of credit in an Bount of 150I of the <br />expected development costs as deter~ined by the City <br />Engineer, Accompanyit~ such a~reement shall be a statement <br />from the ovner indicating the Cityts right of entry to the <br />property if it becomes necessary to complete the agreed upon <br />york. <br /> <br />A schedule of fees for the examination and approval of site plans <br />leading to an environmental permit and the inspection of all <br />required improvements and conditions in such plans shall be <br />deteradned by resolution of the City Council vhich ~ay fron time <br />to time change such schedule. Prior to approval of any site plan, <br />such fees shall be paid to the Zonin~ Administrator and be <br />deposited to the credit of the general fund. <br /> <br />Effect of Permit <br /> <br />The granting of an environ~ental permit under the provisions of <br />this section shall in no ray affect the ovners or the permtteeta <br />responsibility to obtain the approval required by any other <br />statute, ordinance or re~ulation of any Federal or State agency or <br />subdivision thereof. <br /> <br />River Crossing <br /> <br />a) <br /> <br />Utility Facilities. Utility crossings of the Critical Area <br />Corridor or routine vithin the corridor shall meet the <br />following standards: <br /> <br />1) <br /> <br />Underground placing of the utility facility shall be <br />required unless economic, technological and land <br />characteristic factors make underground placement <br />infeasible. Economic considerations along shall not be <br />made the major determinate regarding feasibility. <br /> <br />2) <br /> <br />Overhead crossings, if required, shall meet the <br />following criteria: <br /> <br />a) <br /> <br />b) <br /> <br />c) <br />d) <br /> <br />/'he crossings shall be adjacent to or part of an <br />existing utility corridor, including bridge or <br />overhead utility lineal <br />/[11 structures utilized shall be as compatible as <br />practicable vtth land use, scenic v/ews and <br />existing transmission structures in height, <br />material, color and design; <br />Right of ~ay clearance shall be kePt to a minimumI <br />Vegetative screening shall be utilized to the <br />maximu~ extent consistent ~dth safety <br />requirementsl <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.