My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/24/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 03/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:53 PM
Creation date
3/25/2015 10:18:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
556
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. FINANCING <br />5.1 Opinion of Cost <br />The lump sum engineer's opinion of probable costs for this project is $634,880. <br />Estimated costs include 10% contingency costs, plus 25% indirect costs for administrative, <br />engineering, and legal costs. <br />5.2 Funding <br />5.2.1 Assessments <br />Assessments are proposed to be levied against 124 properties that have direct access to <br />each of the improved street segments. In accordance with the City's Special Assessments <br />Policy, each property is proposed to be assessed based on the "per lot" method as each <br />property will receive approximately the same benefit due to the proposed improvements. <br />Preliminary assessments are proposed in the amount of $1,280 per lot over each project <br />area, resulting in a total assessment amount of $158,720. This represents 25% of the total <br />eligible project costs in accordance with the adopted Special Assessments Policy. Each <br />of the assessable properties is preliminarily proposed to be assessed for the improvements <br />in accordance with the recently adopted Special Assessments Policy, chapter 8 of the City <br />Charter, and applicable City codes. <br />The preliminary assessment map and roll are included in Appendix C. <br />5.2.2 City Contribution <br />The City contribution to the project includes all funding in excess of the amount collected <br />through special assessments to benefiting properties which totals $476,160. No funds <br />were budgeted for this project in 2015. However, the City recently adopted a five-year <br />street reconstruction overlay plan that will allow the City to issue street reconstruction <br />bonds to cover all costs required to pay for the improvements proposed within this report, <br />of which a portion will be repaid through special assessments. <br />This improvement project is included in the City's current 5 -year Capital Improvement <br />Plan. <br />Feasibility Report <br />2015 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 15-00 <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.