Laserfiche WebLink
5. FINANCING <br />5.1 Opinion of Cost <br />The lump sum engineer's opinion of probable costs for this project is $634,880. <br />Estimated costs include 10% contingency costs, plus 25% indirect costs for administrative, <br />engineering, and legal costs. <br />5.2 Funding <br />5.2.1 Assessments <br />Assessments are proposed to be levied against 124 properties that have direct access to <br />each of the improved street segments. In accordance with the City's Special Assessments <br />Policy, each property is proposed to be assessed based on the "per lot" method as each <br />property will receive approximately the same benefit due to the proposed improvements. <br />Preliminary assessments are proposed in the amount of $1,280 per lot over each project <br />area, resulting in a total assessment amount of $158,720. This represents 25% of the total <br />eligible project costs in accordance with the adopted Special Assessments Policy. Each <br />of the assessable properties is preliminarily proposed to be assessed for the improvements <br />in accordance with the recently adopted Special Assessments Policy, chapter 8 of the City <br />Charter, and applicable City codes. <br />The preliminary assessment map and roll are included in Appendix C. <br />5.2.2 City Contribution <br />The City contribution to the project includes all funding in excess of the amount collected <br />through special assessments to benefiting properties which totals $476,160. No funds <br />were budgeted for this project in 2015. However, the City recently adopted a five-year <br />street reconstruction overlay plan that will allow the City to issue street reconstruction <br />bonds to cover all costs required to pay for the improvements proposed within this report, <br />of which a portion will be repaid through special assessments. <br />This improvement project is included in the City's current 5 -year Capital Improvement <br />Plan. <br />Feasibility Report <br />2015 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 15-00 <br />Page 7 <br />