Laserfiche WebLink
Review File: COR Parkview Addition/ Parkview East Apartments <br />Preliminary Plat/ Site Plan Request <br />Engineering Review <br />Page 3 of 4 <br />C1.5 — Rock Construction Entrances are ineffective in Ramsey. Add the following text to the <br />SWPPP and Grading Plan Notes: "A street sweeper must be available within 3 hours upon notice <br />from the City that the streets need to be swept." <br />C1.6 — The underground storage may not be perforated or allow infiltration. <br />C1.7 — Revise typical street section - 6" Premium Topsoil, 6' wide sidewalk, all references to <br />Class 5 shall read Class 5, Ramsey Modified. Gradation is shown on Ramsey Street Details. Use <br />Ramsey Detail STR-25 for connection to existing street. <br />C1.8 — Pipe from STMH 105 — MH106 is not listed in table. Pipe from 300 to 301 is not shown <br />on plans. <br />C2.0 — This sheet is incomplete. Needs project name and details. <br />All Plan Sheets — Show continuation notes for 145th Avenue. Provide plan sheet showing entire <br />plat with proposed improvements. <br />C2.3 — There is an existing 6" watermain from Sapphire Street to Rhinestone Street across Lot 1, <br />Block 1, Ramsey Town Center 1 1th Addition, This must be shown. Move the label out of the <br />underground storage area. Only 1 access will be permitted to Rhinestone Street from this plat <br />and 1 1th Addition. A detailed Temporary Pedestrian Access Route Detour must be added to the <br />plan set. The Ramsey HRA does not own the existing commercial lot. Revise the data. A <br />special detail will be required for the Rhinestone Street Connection as it is a concrete street. <br />Coordinate with the City for the specific requirements of this detail. <br />C2.4 — Provide details for the retaining wall on the east side of Sapphire Street. All sidewalks are <br />6' wide. Pedestrian ramps are required at all intersections in Public right of way and where the <br />sidewalk crosses internal drives. A detail for each is required as noted above. <br />C2.5 — There is existing storm pipe north east of MH106. This is 52" arch pipe. Add notes to <br />detail disposition of this pipe (ie. Removal, reconnection) <br />C3.0 — The plan and profile alignments must line up. Break the plan view into two windows if <br />necessary. Show disposition of 52" arch pipe north of MH106. Run Watermain under sanitary <br />sewer at MH A. Add note: "All watermain 6" and smaller shall be Class 53. Watermain 8" and <br />larger shall be Class 52." <br />C3.1 — Use 2-45° bends in place of 90° bends. Provide drainage and utility easement over all <br />watermain in site. <br />Specifications <br />Include City where ever Engineer or Owner is referenced in Specifications. <br />