My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/09/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 04/09/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:42 AM
Creation date
5/14/2015 9:03:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/09/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />3/27/15 <br />PROJECT ADDRESS <br />TBD <br />PROJECT. TITLE <br />PARKVIEW EAST <br />EscRow # <br />114584 <br />DEPARTMENT: <br />Community Development: Planning Division (Landscape Plan & Environmental <br />Resources) <br />TECHNICAL REVIEWER: <br />Name: Chris Anderson, City- Planner <br />Phone: 763-433-9817 <br />Email: canderson@,cityroframsey.com <br />The COR Design Framework outlines the required streetscape elements such as tree species, <br />tree spacing, boulevard width, and sidewalk width based on the street hierarchy. There site <br />abuts three (3) different streets, each with a different designation (Downtown, Connector, and <br />Parkway). However, along Rhinestone Street, there is existing sidewalk and boulevard, which <br />shall be utilized. Similarly, along Sapphire Street south of the project site, sidewalk and <br />boulevard dimensions have already been established and the intention should be to mimic <br />those to maintain a consistent appearance. Along Ramsey Parkway, boulevard and sidewalk <br />width both should be six (6) feet. Finally, tree spacing for streetscape plantings should be <br />between thirty (30) and thirty-five (35) feet. <br />We offer the following comments regarding the Landscape Plan prepared by Bolton & Menk, Inc. <br />and dated March 3, 2015: <br />• The width of the boulevard area along Ramsey Parkway is not specified on the plans. <br />The width should be at least six (6) feet and the additional width should be toward the <br />building not the curb. This may require shifting the sidewalk closer to the building but <br />that would benefit the project by improving the build to requirement (which is measure <br />from edge of sidewalk). If this results in the public sidewalk being partially on private <br />property, a permanent public easement over that portion of the sidewalk shall also be <br />granted to the City for public purposes. Please revise Sheet C2.4 to identify the <br />boulevard width as six (6) feet. <br />• The plans show a sidewalk connecting Ramsey Parkway and 145th Ave, which was <br />requested by the City. It is presumed that park patrons (or other public) may traverse <br />this sidewalk and thus, it would be beneficial to encumber this with a permanent public <br />easement. <br />• Sidewalk width along 145th Ave should be increased to six (6) feet with the expansion <br />being toward the future building (away from the curb). Please revise Sheet C2.4 to <br />accordingly. <br />• The boulevard area must be finished with topsoil and sod and the developer (and <br />eventually the management company) shall be responsible for its establishment (e.g. <br />
The URL can be used to link to this page
Your browser does not support the video tag.