Laserfiche WebLink
Review File: Harvest Estates (15153 Nowthen Blvd. NW) <br />Preliminary Plat <br />April 3, 2015 <br />Page 5 of 6 <br />Developer that would either 1) amend the scope of Phase I or 2) divide the project into three (3) phases. Regardless, <br />Staff will support the current phasing plan as outlined in the Purchase Agreement. The intent of this section is to <br />outline outcomes and alternatives now that additional design details are known that weren't available during concept <br />and sketch plan review. <br />Only a portion of 152nd Lane (proposed <br />Northern street) will be able to be <br />constructed with the current phasing plan <br />due to existing buildings. Interim Step #1 <br />of the current phasing plan would utilize <br />the existing parking lot for the former <br />police station as a `temporary cul-de-sac'. <br />Interim Step #2 of the current phasing plan <br />in the event of delay of Phase II would be <br />to construct an actual cul-de-sac at the end <br />of 152' Lane for Phase I. As the <br />Commission is aware, these `temporary' <br />cul-de-sacs can be challenging. There are <br />ten (10) lots proposed on 152' Lane in <br />Phase I. <br />All of 152' Avenue (proposed Southern <br />street) will be able to be constructed as <br />designed without impacts to existing <br />buildings or need for temporary cul-de- <br />sacs. There are fourteen (14) lots proposed <br />on 152nd Avenue, all created in Phase I. <br />Additionally, there are seven (7) lots <br />proposed to be created along existing <br />Helium Street. <br />'-AL'INL DR.,''L ( 5 RD AVENUE h.'W'.) <br />Historically, the City sees an average of ten (10) to twenty (20) lots per development constructed each year in the <br />current market environment. City Staff has received this feedback from a number of local developers as well. Twenty- <br />one (21) lots would be created with the construction of 152' Avenue and lots created along existing Helium Street. <br />The benefit to the City would be to avoid a phased construction of 152nd Lane, avoiding construction staging conflicts <br />and temporary cul-de-sac conditions. The benefit to the Developer would be a lower Financial Guarantee requirement <br />and cost -savings in construction staging and reconstruction. The City's Subdivision Ordinance would provide the <br />City the tools to require full cul-de-sac construction and associated rights-of-way. If the City were to require full cul- <br />de-sac construction and associated right-of-way, two (2) lots would need to be removed from Phase I. <br />Grading Plan <br />Development of the Grading Plan has discovered the need for more imported fill to be required than anticipated by <br />the Developer in order to obtain the mix of floor plans desired by the Developer. The geographic area of impact is <br />focused on the future Phase II. <br />