My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/09/2015
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2015
>
Agenda - Planning Commission - 04/09/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:22:42 AM
Creation date
5/14/2015 9:03:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/09/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />4/3/15 <br />PROJECT ADDRESS <br />UNKNOWN <br />PROJECT. TITLE <br />HARVEST ESTATES <br />ESCROW # <br />114538 <br />DEPARTMENT: <br />Community Development- Planning Division (Landscape Plan & Environmental <br />Resources) <br />TECHNICAL REVIEWER: <br />Name: Chris Anderson <br />Phone: 763-433-9817 <br />Email: canderson@cityoframsey.com <br />We offer the following comments regarding the Landscape and Tree Preservation Plans prepared by <br />Hedlund and dated March 5, 2015: <br />Tree Preservation: At least forty percent (40%) of the Diameter at Breast Height (DBH) inches of <br />significant trees shall be preserved. For every one (1) inch of significant tree DBH removed beyond this <br />threshold, 1.25 inches of DBH shall be replanted or $125.00 shall be paid to the City in restitution (or <br />some combination thereof). Invasive species, diseased trees, and trees removed for stormwater ponds, <br />public trails and sidewalks, shall not be considered when calculating the removal threshold (they should <br />be noted as such in the inventory to receive credit). <br />Sheet C-5 indicates that there is a total of 1,435 total DBH on site (this excludes all invasive species, <br />primarily Siberian Elm) and of that, 1,360 DBH inches will be removed (five percent [5%] of significant <br />tree DBH inches preserved). Thus, reforestation (and/or restitution) should equate to 624 inches (1360- <br />861=499 inches beyond removal threshold x 1.25"). However, the reforestation requirement exceeds the <br />base landscape requirement (two [2] trees per lot) and per the direction of the Environmental Policy <br />Board, the greater of the base landscape requirements or the reforestation requirement (reduced by the <br />base landscape requirement) shall apply. This results in a total of 400 inches of required reforestation. <br />The following revisions are required: <br />• Sheet C-5 must be revised as follows: <br />o Allowable Removal needs to be amended to read 1435 x 60% (2545 includes the Siberian <br />Elm DBH). <br />o All reforestation perimeter plantings (excluding required front yard trees) shall be <br />installed as a Stage I improvement by the developer. <br />o Plan sheet should include tree save fencing around trees being preserved. <br />• Sheet C-6 must be revised as follows: <br />o Tree save fencing must be shown on the grading plan and shall be installed at or beyond <br />the dripline of trees or groups of trees being preserved. Tree save fencing shall be <br />installed and maintained in a plumb condition throughout all land disturbance activities. <br />• Sheet CE -1 must be revised as follows: <br />o The legend includes a symbol for tree protection but that symbol is not shown on the plan <br />sheet. Update this sheet (and the grading plan and tree preservation plan sheets) to show <br />the tree protection fencing around those trees being preserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.