Laserfiche WebLink
maximum allowed with the internal garage spaces. The additional spaces are not in a response to building code but <br />rather based on perceived need due to the number of two (2) and three (3) bedroom units in the building which <br />could result in more parking demand. The proposed break down in units is as follows: forty-one (41) percent one (1) <br />bedroom; forty-five (45) percent two (2) bedroom and fourteen (14) percent three bedroom. The additional spaces <br />will also prevent potential use of on -street parking which is particularly important during summer months when the <br />adjacent park is programmed. <br />As the surface parking lot is well screened by either the apartment building or the detached garage structures, and <br />therefore not visible from the roadways, staff supports the additional parking. If concern exists the Planning <br />Commission could recommend that some excess parking be included as a proof of parking area until the need for <br />additional spaces is evident. <br />The COR Design Framework includes Street Design Standards within the COR. The plans will need to be revised to <br />reflect the revisions required in the Staff Review File. Generally speaking, both the sidewalk and boulevard area <br />along Ramsey Parkway will need to be widened. The landscape plan includes rows of street trees along each of the <br />three streets the site abuts. Ramsey Parkway and Rhinestone Street contain two types of trees while Sapphire Street <br />and 145 th Avenue include one type. The proposed trees meet the requirements based on street type. No other <br />landscaping is shown on the plan other than the required street trees. A community garden and playground space is <br />include at the northwest corner. Additional detail and proposed landscaping for this area shall be submitted. The <br />Environmental Policy Board made several advisory recommendations to enhance the internal landscaping plan, as <br />outlined in the Staff Review File. <br />High quality architecture and building materials is an essential component in fulfilling the objectives of the COR <br />Design Framework. Roof design, materials, amount of windows, and overall design that breaks up the different <br />floors and walls are all important elements to the overall building design. In the COR -1 subdistrict buildings are <br />placed closer to the street so greater emphasis is placed on materials and design features at the street level. <br />Plans for the front elevation (south) and rear elevation (north) for the apartment building have been provided. Plans <br />for each side elevation will also be required. The proposed materials consist of stone and brick at the base. The rear <br />elevation includes an enhanced stone entry with canopy and additional stone above. Other materials include <br />composite panel (i.e. fiber cement panels) and steel lap and vertical siding. Metal siding can be used as a <br />complementary material. In COR -1 subdistrict buildings shall be primarily brick or comparable alternative and <br />shall comprise a minimum of fifty (50) percent of the non -glazed wall area. Calculations shall be provided for <br />brick and stone for each elevations. <br />Full colored elevation plans should be provided. The combination of composite and steel in the differing patterns <br />divides the floors and sections of the building. Multiple sections of the building are articulated to break up the flat <br />wall. In addition windows and decks are proposed for each unit that provide further breaks in the building wall <br />design. Additional information is required for the specific appearance of the individual air conditioning units. Staff <br />is concerned over the appearance, color, size and overall look of units on each elevation. <br />The south elevation includes garage doors for tuck under garages. Garage doors shall be in colors that are <br />complementary to the main building materials. The roof design is pitched with asphalt shingles. The elevation <br />facing Ramsey Parkway is actually the rear of the building and contains the same materials as the front. The first <br />floor contains windows to create street -level interest and pedestrian scale along this street frontage. The northern <br />elevation does include an entrance for the building. <br />Five detached garage buildings are planned in the southern portion of the site. Three long buildings each containing <br />16 stalls are located in a row along the south property line with two additional buildings just north of this row <br />containing 22 stalls each. The garage buildings contain the same materials as the apartment building. The roofs are <br />pitched with additional accenting so that they are of a higher design standard than typical detached structures. The <br />materials will include stone, horizontal lap siding, shake siding and an asphalt shingle roof. The sides will contain <br />the stone and horizontal siding. The additional roof treatments and glass demonstrate a good effort in enhancing the <br />design of these detached structures. The use of stone at the base will help improve the longevity of these structures. <br />Staff would recommend considering all brick or stone on the back side of these garages in lieu of any lap siding. <br />