My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:46 PM
Creation date
5/14/2015 2:43:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />MONITORING AND MAINTENANCE <br />SPECIFICATIONS AND PROCEDURES <br />1. GENERAL <br />This Exhibit describes the policies and procedures that will be utilized to monitor and <br />maintain the ZAYO System. ZAYO shall ensure that the System is maintained according <br />to the Monitoring and Maintenance Specifications and Procedures specified herein, <br />through application of commercially reasonable and accepted industry standards, and in <br />accordance with manufacturers' specifications. The purpose and result of monitoring and <br />maintenance shall be to assure (in the case of routine maintenance), or restore (in the case <br />of non -routine maintenance) the functionality of the ZAYO System. ZAYO reserves the <br />right to modify procedures as appropriate to ensure that performance specifications are <br />achieved. <br />2. ADMINISTRATION <br />ZAYO shall maintain a comprehensive database ("Database") of all relevant information <br />associated with the ZAYO System to ensure prompt identification and appropriate <br />response to routine and corrective maintenance situations. The Database shall identify <br />and document the ZAYO System and all facilities installed in ZAYO System, including <br />but not limited to: County's fiber optic cable type, number and color coding of fiber <br />strands, origin and destination of each fiber strand, identification of in -use cables, <br />technical requirements and specifications. <br />3. ZAYO RESOURCES <br />ZAYO will perform cable and conduit maintenance and repair around the clock, on a <br />twenty-four (24) hour per day, seven (7) days per week basis (24x7). ZAYO shall be <br />available during normal business hours (7:00 a.m, to 5:00 p.m.) and during off -hours <br />(before 7:00 a.m., after 5:00 p.m., weekends and holidays). • <br />ZAYO shall establish a ZAYO System Maintenance Center and assign a dedicated <br />maintenance manager to oversee and coordinate day-to-day maintenance activities. The <br />Maintenance Center shall be equipped to receive ZAYO System alarms twenty-four (24) <br />hours per day, seven (7) days per week, three -hundred -sixty-five (365) days per year. The <br />maintenance manager shall be responsible for ensuring that preventative, corrective, and <br />emergency maintenance activities are carried out in a timely fashion and that <br />maintenance activities are coordinated with County and any of County's users. <br />ZAYO shall provide qualified personnel, office services, vehicles, and all tools and <br />materials required for the safe and proper performance of maintenance procedures. <br />Specifically, ZAYO shall retain and maintain all appropriate equipment necessary for <br />routine and preventative maintenance as well as corrective maintenance and emergency <br />restoration. ZAYO shall have an Optical Time Domain Reflectomoter (OTDR) and <br />61 <br />Anoka County Master Fiber IRU 8.14.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.