Laserfiche WebLink
EXHIBIT E <br />METROPOLITAN (LOCAL LOOP) NETWORK FIBER <br />ACCEPTANCE TESTING PROCEDURES AND STANDARDS <br />The intent of this Exhibit is to identify the fiber acceptances testing procedures and <br />standards used -within the Zayo's metropolitan networks. Deviations from these <br />specifications may occur if Zayo acquires a portion of the Zayo System from a third party <br />pursuant to the Agreement. <br />1. All splices shall be fusion spliced. Mechanical splices are only allowed during <br />temporary restoration and will be replaced with fusion splices. <br />2. After end-to-end connectivity on the fibers has been completed, bi-directional OTDR <br />span and power meter testing will be completed. Zayo shall perform tests after the <br />fiber cable is installed and the splicing enclosures have been completed and are in <br />their final resting configuration with the cable vault or hand hole covers closed. This <br />ensures that no micro or macro bending problems with the cable or fiber strands will <br />contribute to the loss/attenuation measurements. <br />3. Power meter tests shall be completed to verify and insure that no fibers have been <br />crossed at any of the splice points within the network. Zayo shall test and record <br />power level readings on all fiber strands in both directions of transmission (bi- <br />directionally) using the 1310 & 1550 nm wavelengths. <br />4. All OTDR and power meter tests shall be completed as follows: <br />a. All OTDR traces shall be taken from both ends of a section (between adjacent <br />locations) and recorded using the 1310 nm & 1550 nm wavelength. <br />Loss/attenuation measurements for each splice point from both directions shall <br />be taken and recorded. <br />b. The end-to-end loss value as measured with an industry -accepted laser source • <br />and power meter should have an attenuation rating of less than or equal to the <br />following: <br />(1) At 1310 nm: (0.35 dB/km x km of cable) + (number of connectors x 0.50) + <br />(0.15 x number of splices). <br />(2) At 1550 run: (0.25 dB/km x km of cable) + (number of connectors x 0.50) + <br />(0.15 x number of splices). <br />.c. Zayo's loss/attenuation objective for each fiber optic splice is 0.15 dB when <br />measured in one direction with an OTDR test set (excluding connector loss, <br />which is typically 0.50 dB per mated connector pair). If after three attempts this <br />parameter is not met, the splice will be marked as Out -Of -Spec (OOS) and the <br />Splice will remain provided the average Loss/attenuation value of all splices- on an <br />individual fiber basis shall not exceed 0.15 dB for the entire ring or subsystem. <br />d. For bi-directional OTDR testing, the distance from Location "A" and Location - <br />"Z" shall be recorded for each splice point. The loss/attenuation at each splice <br />point shall be recorded at both wavelengths (1310 nm & 1550 nm) in each <br />64 • <br />Anoka County Master Fiber IRU 8.14.10 <br />