|
Category
<br />City of Ramsey, Minnesota
<br />Capital Improvement Program
<br />2015 thru 2019
<br />PROJECTS BY CATEGORY
<br />Project# Priority 2015 2016 2017 2018 2019 Total
<br />Water Utility Improvement
<br />Complete Pump House 3 04-WTR-005
<br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) 04-WTR-009
<br />Water Treatment Plant Construction 04-WTR-017
<br />Watermain Looping: (Ramsey Blvd to Traprock St) 04-WTR-018
<br />1.5 MG Ground Storage Reservoir 05-WTR-004
<br />Well Rehabilitation & Pump Replacement 07-WTR-001
<br />River Pines Lift Station Water Connection 08-WTR-003
<br />Fire Station #1 Extension of Water 11-WTR-003
<br />Watermain Sunfish Lk Blvd 12-WTR-001
<br />REFURBISH WATER TOWER #2 14-WTR-001
<br />REFURBISH WATER TOWER #1 14-WTR-002
<br />BUNKER/PUMA WATER TRUNK EXT 14-WTR-003
<br />Gamet Street Reconstruction 15-WTR-001
<br />Water Utility Improvement Total
<br />GRAND TOTAL
<br />6 60,000 60,000
<br />6 350,000 350,000
<br />6 9,786,010 9,786,010 19,572,020
<br />6 400,000 400,000
<br />6 2,000,000 2,000,000
<br />6 32,000 35,000 38,000 41,000 44,000 190,000
<br />6 20,000 20,000
<br />6 55,000 55,000
<br />6 450,000 450,000
<br />6 1,300,000 1,300,000
<br />6 1,300,000 1,300,000
<br />6 700,000 700,000
<br />6 170,000 170,000
<br />257,000 1,545,000 3,808,000 11,127,010 9,830,010 26,567,020
<br />257,000 1,545,000 3,808,000 11,127,010 9,830,010 26,567,020
<br />Page 177
<br />
|