My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:46 PM
Creation date
5/14/2015 2:43:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the remaining street reconstruction projects in the 5 -year CIP include public utility extensions so ample time should <br />be available to address this issue in the future. <br />This project is necessary, cost-effective and feasible from an engineering standpoint, and can be constructed as <br />proposed. <br />Alternatives: <br />Alternative Action #1 — Motion to adopt Resolution #15-02-034 ordering final plans and specifications for <br />Improvement Project #13-10; Garnet Street and 168th Avenue Reconstruction, as proposed by staff. <br />Alternative Action #2 — Motion to adopt Resolution #15-02-034 ordering final plans and specifications for <br />Improvement Project #13-10; Garnet Street and 168th Avenue Reconstruction, with the following modifications to <br />staff's proposed design: <br />Alternative Action #3 — Motion to deny adoption of Resolution #15-02-034 at this time. <br />Funding Source: <br />The Feasibility Report was completed in-house as part of staff's regular duties. The Geotechnical Evaluation <br />Report completed by NTI had a cost of $2,525, which is included in the indirect costs. <br />The engineer's opinion of probable costs per street segment, including all costs for surface (streets), stormwater, <br />water, and sanitary sewer, is $1,125,000 for Garnet Street and $550,000 for 160 Avenue, which totals $1,675,000. <br />Estimated costs include 10% contingency costs plus 25% indirect costs for administrative, engineering, finance and <br />legal costs.Appendix B of the Feasibility Report includes a detailed cost summary. <br />This improvement project, which is included in the City's 5 -year Capital Improvement Plan for construction in <br />2015, can be funded using a combination of special assessments to benefiting properties, and sewer, water and <br />stormwater utility funds. The issuance of Street Reconstruction Bonds will fund the surface (street) improvements <br />as outlined in the 2015-2019 CIP as discussed and approved in a previous case. <br />Per the adopted Special Assessments Policy, the City may consider assessing up to 25% of applicable street <br />reconstruction project costs. However, based on the existing large lot sizes (2+ acres) and street frontages (200+ <br />linear feet) along these streets, the preliminary special assessment proposed in the Feasibility Report is set at $6,500 <br />per lot. This equates to about 5.4% of all eligible surface (street) improvement costs. This totals $78,000 for the 12 <br />single-family residential property owners with direct access onto the improved street segments. The funding section <br />of the Feasibility Report includes more detail on the proposed assessments. <br />The table below shows the estimated project costs and funding sources per improvement category. <br />Improvement <br />Category <br />Assessments <br />City <br />Funds <br />Total <br />Surface <br />$78,000 <br />$958,000 <br />$1,036,000 <br />Storm Sewer <br />— <br />$198,000 <br />$198,000 <br />Water Main <br />— <br />$271,000 <br />$271,000 <br />Sanitary Sewer <br />— <br />$170,000 <br />$170,000 <br />Totals <br />$78,000 <br />$1,597,000 <br />$1,675,000 <br />The table below shows the estimated assessment amounts based on 10 and 5 year terms, a 3.9% interest rate, and <br />an assessment hearing date of October 13, 2015 (444 days in first year). <br />IP #13-10 Estimated Special Assessments <br />10 - Year Term <br />3.900% <br />1 <br />Pay-off <br />
The URL can be used to link to this page
Your browser does not support the video tag.