My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/10/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:46 PM
Creation date
5/14/2015 2:43:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/10/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, and cable utilities regarding this project. If the City <br />Council approves the preparation of Plans and Specifications, staff will meet with the private <br />utility companies to discuss the proposed improvements as noted in the project schedule within <br />this Report. The alignment of streets, sidewalks and pathways will be considered to minimize <br />impacts to private utilities. No impacts to power poles are anticipated with this project. <br />Should any of the utility companies indicate that they wish to upgrade, replace and/or otherwise <br />modify their services during this project, any such upgrades, replacements and/or modifications <br />will be at the sole discretion and cost of the private utility. <br />City staff will contact Xcel Energy to see if they would like to bury any of their overhead lines <br />with this project. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />• MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />• LRRWMO Permit WMO Stormwater Permit <br />• Met Council Sanitary Sewer Extension Permit <br />4.8 Right-of-Ways/Easements <br />It is anticipated that all improvements will occur within existing City right-of-ways and/or <br />easements, with the exception of tying into private driveways. However, it is not anticipated that <br />the City will need to acquire any additional right-of-way or easements for this project. Therefore, <br />potential costs for any right-of-way or easements are not included in the probable project costs. <br />Rights of entries from individual property owners may need to be obtained prior to construction <br />commencing for grading, driveway removals and paving, utility construction, and restoration <br />activities. <br />Feasibility Report <br />Garnet Street and l68`" Avenue Reconstruction <br />City of Ramsey Project No. 13-10 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.