Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE <br />168th AVENUE RECONSTRUCTION (670 LF) <br />NOW THEN ESTATES <br />CITY OF RAMSEY <br />JANUARY 8, 2015 <br />Prepared by: Bruce Westby, P.E. <br />Proposed Construction Year: 2015 <br />CONNECT TO EXISTING WM 1 0 EACH $1,250.00 $1,250.00 <br />SUMMARY OF STREET RECONSTRUCTION WITH UTILITIES <br />TOTAL WATERMAIN CONSTRUCTION $70,750.00 <br />TOTAL STREET CONSTRUCTION $256,907.91 <br />TOTAL STORM SEWER CONSTRUCTION $37,480.00 <br />TOTAL SANITARY SEWER CONSTRUCTION $33,405.00 <br />TOTAL WATERMAIN CONSTRUCTION $70,750.00 <br />10% CONTINGENCY $39,854.29 <br />ENGINEERING (18%) ADMINISTRATIVE AND LEGAL (7%) $109,599.30 <br />TOTAL ESTIMATED PROJECT COST $547,996.50 <br />H:\Cases\CC\2015\1-13-15\Garnet&168thAve Engrs Est Feas Rpt FINAL PDF Page 6 of 6 <br />