My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/24/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 02/24/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:02:10 PM
Creation date
5/14/2015 2:55:09 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/24/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Fees Payable to the City <br />1 Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br />Dedication requirements. The 2015 Park Dedication Fee applicable to the Plat is $2,600 <br />per residential unit. PERMITTEE must pay a Park Dedication Fee of Two Thousand Six <br />Hundred Dollars and No Cents ($2,600 x 1 unit = $2,600.00). The PERMITTEE <br />acknowledges that these fees are estimates. The rate in effect when the Plat is recorded will <br />be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. The 2015 Trail Development Fee applicable to the Plat is <br />$700 per residential unit. PERMITTEE must pay a Trail Development Fee of Seven <br />Hundred Dollars and No Cents ($700 x 1 unit = $700.00). The PERMITTEE <br />acknowledges that these fees are estimates. The rate in effect when the Plat is recorded will <br />be collected. <br />3. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. The 2015 Stormwater Management Fee $459 per <br />residential unit. PERMITTEE must pay a Stormwater Management Fee of Four Hundred <br />Fifty Nine Dollars and No Cents ($459 x 1 unit = $459.00). The PERMITTEE <br />acknowledges that these fees are estimates. The rate in effect when the Plat is recorded will <br />be collected. <br />4. Sanitary Sewer Connection (Trunk) Fees. The Plat is subject to the Brookfield Addition <br />Amendment to Water Main and Sanitary Sewer Cost Contribution/Reimbursement <br />Agreement (the "Reimbursement Agreement"). Per Section 3.01 of the Reimbursement <br />Agreement, future lots platted from outlots or other lots in Brookfield First, Second, or <br />Third Addition will pay no Trunk Fee for each lot platted. The amount deemed reduced by <br />the trunk fee credit will be One Thousand One Hundred Thirty Seven Dollars and No Cents <br />($1,137 x 1 unit = $1,137.00). This amount will be subtracted from the total amount to be <br />credited to 21' Century Bank. A copy of the Reimbursement Agreement is attached as <br />Exhibit B hereto. <br />5. Water Connection (Trunk) Fees. Per Section 3.01 of the Reimbursement Agreement, <br />future lots platted from outlots or other lots in Brookfield First, Second, or Third Addition <br />will pay no Trunk Fee for each lot platted. The amount deemed reduced by the trunk fee <br />credit will be One Thousand Nine Hundred Twenty Five Dollars and No Cents ($1,925 x <br />1 unit = $1,925.00). This amount will be subtracted from the total amount to be credited <br />to 21' Century Bank. A copy of the Reimbursement Agreement is attached as Exhibit B <br />hereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.