My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council - 10/23/1984
Ramsey
>
Public
>
Minutes
>
Council
>
1984
>
Minutes - Council - 10/23/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:34:15 AM
Creation date
4/1/2004 12:40:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council
Document Date
10/23/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Changes <br /> <br /> Increase <br />In Contract Price <br /> <br /> Increase <br />In Contract Price <br /> <br />Change the alignment of the <br />subttrunk sewer between Manholes <br />15 & 16 as shc~n on plan sheets <br />2, 6, 7 & 15. <br /> <br />0 <br /> <br />0 <br /> <br />Lower the propsoed street grade <br />on Waco Street between Station <br />19 & 28 and on 147th Circle NW <br />and revise the manhole builds as <br />on plan sheets 9 & 11. <br /> <br />0 <br /> <br />0 <br /> <br />Lower the watermain on Waco Street <br />between Stations 19 & 28 and on <br />147th Circle NW as shown on plan <br />sheets 18 & 20. <br /> <br />0 <br /> <br />0 <br /> <br />Lower the storm sewer on Waco Street <br />between Stations 15 & 22 as shown <br />on plan sheet 27. <br /> <br />Add 340 linear feet of 10" ductile <br />iron pipewatermain and a 10" tee <br />as shown on plan sheets 2 & 15 at <br />$14.05 per linear foot of pipe and <br />$255 per tree. <br /> <br />0 <br /> <br />0 <br /> <br />$5,032.00 <br /> <br />e <br /> <br />m <br /> <br />Add two hydrants and six inch valves <br />along the trunk watermain as shown <br />on plan sheet 15 at $285 per valve <br />and $810 per hydrant. <br /> <br />Add 115' of 15" RCP Class III storm <br />sewer and a 15" flared end with a <br />grate between Lots 13 & 14, Block 5 <br />as shown on plan sheet 27 at $19.90 <br />per linear foot of pipe and $350 for <br />the flared end. <br /> <br />Revise the street grades at 149th <br />Avenue and its intersection with <br />Yak/ma St. & Skc~o St. as shown <br />plan sheets 12, 13, 21, 22, 23, <br />26 & 28. <br /> <br />0 0 <br /> <br />$2,190.00 <br /> <br />$2,638.50 <br /> <br />Totals 0 $9,860.50 <br /> <br /> Net Change In Contract Price - $9,860.50 <br /> <br />Please refer to River's Bend Construction Project ~84-12 and ~84-18 project <br />files for change order #1. <br /> <br />Page 19 of 20 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.