Laserfiche WebLink
Changes <br /> <br /> Increase <br />In Contract Price <br /> <br /> Increase <br />In Contract Price <br /> <br />Change the alignment of the <br />subttrunk sewer between Manholes <br />15 & 16 as shc~n on plan sheets <br />2, 6, 7 & 15. <br /> <br />0 <br /> <br />0 <br /> <br />Lower the propsoed street grade <br />on Waco Street between Station <br />19 & 28 and on 147th Circle NW <br />and revise the manhole builds as <br />on plan sheets 9 & 11. <br /> <br />0 <br /> <br />0 <br /> <br />Lower the watermain on Waco Street <br />between Stations 19 & 28 and on <br />147th Circle NW as shown on plan <br />sheets 18 & 20. <br /> <br />0 <br /> <br />0 <br /> <br />Lower the storm sewer on Waco Street <br />between Stations 15 & 22 as shown <br />on plan sheet 27. <br /> <br />Add 340 linear feet of 10" ductile <br />iron pipewatermain and a 10" tee <br />as shown on plan sheets 2 & 15 at <br />$14.05 per linear foot of pipe and <br />$255 per tree. <br /> <br />0 <br /> <br />0 <br /> <br />$5,032.00 <br /> <br />e <br /> <br />m <br /> <br />Add two hydrants and six inch valves <br />along the trunk watermain as shown <br />on plan sheet 15 at $285 per valve <br />and $810 per hydrant. <br /> <br />Add 115' of 15" RCP Class III storm <br />sewer and a 15" flared end with a <br />grate between Lots 13 & 14, Block 5 <br />as shown on plan sheet 27 at $19.90 <br />per linear foot of pipe and $350 for <br />the flared end. <br /> <br />Revise the street grades at 149th <br />Avenue and its intersection with <br />Yak/ma St. & Skc~o St. as shown <br />plan sheets 12, 13, 21, 22, 23, <br />26 & 28. <br /> <br />0 0 <br /> <br />$2,190.00 <br /> <br />$2,638.50 <br /> <br />Totals 0 $9,860.50 <br /> <br /> Net Change In Contract Price - $9,860.50 <br /> <br />Please refer to River's Bend Construction Project ~84-12 and ~84-18 project <br />files for change order #1. <br /> <br />Page 19 of 20 <br /> <br /> <br />