My WebLink
|
Help
|
About
|
Sign Out
Home
Resolution - #15-04-100 - 04/14/2015
Ramsey
>
Public
>
Resolutions
>
2015
>
Resolution - #15-04-100 - 04/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 3:01:45 PM
Creation date
5/20/2015 10:59:23 AM
Metadata
Fields
Template:
Resolutions & Ordinances
Resolutions or Ordinances
Resolutions
Resolution or Ordinance Number
#15-04-100
Document Date
04/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1101 11111 11111 IIII 11111 DIII 11111 liii liii <br /> Record ID 2983398 <br /> Councilmember Riley introduced the following resolution and moved for its adoption: E <br /> RESOLUTION#15-04-100 JUN - 52015 <br /> A RESOLUTION APPROVING THE ISSUANCE OF A CONDITIONAL USE PERMIT FOR <br /> THE CONSTRUCTION AND OPERATION OF A 199-FOOT TELECOMMUNICATIONS <br /> TOWER AT 14601 RAMSEY BLVD NW AND DECLARING TERMS OF SAME <br /> WHEREAS, Connexus Energy has properly applied for a conditional use permit to construct <br /> and operate a 199-foot communications tower at their headquarters located at 14601 Ramsey Blvd. NW <br /> and legally described as follows: <br /> Lot 1, Block 1, AEC Energy Park, Anoka County,Minnesota <br /> WHEREAS, the Planning Commission met on March 5, 2015 and conducted a public hearing; <br /> and <br /> WHEREAS,the CITY Council reviewed the request on April 14,2015. <br /> NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF <br /> RAMSEY,ANOKA COUNTY,STATE OF MINNESOTA,as follows: <br /> 1. Based on Findings of Fact #0943, a conditional use permit for a telecommunications monopole <br /> tower and related equipment building (the "Tower") is hereby granted to Connexus Energy <br /> ("PERMITTEE"), <br /> 2. The development of the Site shall be in accordance with the approved site plan prepared by <br /> Connexus Energy, dated January 30,2015, (the "Site Plan"), as shown on Exhibit A, attached <br /> hereto. <br /> 3. The Tower will not exceed 199 feet in height, and will maintain minimum setbacks as shown on <br /> the Site Plan. The setback shall be measured between the base of the tower located nearest the <br /> property line and the actual property line. <br /> 4. The Tower and associated antennas shall be designed to blend into the surrounding environment <br /> through the use of color and design, except in instances where the color is dictated by federal or <br /> state authorities such as the Federal Aviation Administration. Tower architectural standards are <br /> subject to final CITY approval. <br /> 5. The Tower shall be of a monopole design. <br /> 6. No part of the Tower, equipment, guyed wires, or braces shall at any time extend across or over <br /> any part of the public right-of-way, public street, highway, sidewalk, or recreation trail. <br /> 7. The Tower shall not be illuminated by artificial means and shall not display strobe lights unless <br /> such lighting is specifically required by the Federal Aviation Administration or other federal or <br /> state authority for a particular tower, or if required by the CITY for safety reasons. <br /> 8. All utility buildings and structures accessory to a tower shall be architecturally designed to blend <br /> in with the surrounding environment and shall meet the minimum setback requirements of the <br /> 2108718 . 002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.