Laserfiche WebLink
Waco Street / Waeo Drive Paving <br /> <br />This project consists of the regrading and paving of 1,700 feet of dirt street located on <br />Waco Drive N.W. and Waco Street N.W, north of 179th Lane N.W.. The existing streets <br />are proposed to be graded and paved with a 28 foot wide suburban street section with <br />bituminous curb. The project has been petitioned for by the benefited property owners. <br />The estimated construction cost is $30,200 and overhead and previous paving costs will <br />bring the total project cost to $43,200. This project is anticipated to be completed dtmng <br />the summer of 1993. <br /> <br />County Road #5 - Sanitary Sewer Extension <br /> <br />This project consists of an extension of 8" sanitary sewer for a distance of approximately <br />600 feet along the west side of County Road #5, south of the Wood Pond Hills <br />subdivision. The project construction cost is estimated at $14,800 and the total project cost <br />including overhead is estimated to be $19,200. <br /> <br />Sanitary Sewer, Watermain and Street Improvements for 149th Lane N,W. <br /> <br />This project includes the extension of sanitary sewer, watermain and street restoration to 12 <br />parcels fronting on 149th Lane N.W. west of the new Ramsey Meadows Addition. This <br />improvement was petitioned for by the benefited property owners. The estimated project <br />construction cost is $58,500 and the total project cost, including 3% overhead, is estimated <br />to be $76,100. <br /> <br />Street Lights for Priority Intersection Locations <br /> <br />The City has established a policy for installing street lights at prior/ty intersections. There <br />are approximately 150 such intersections which would fall into this classification. It is <br />estimated that the cost of installing lights at these intersections is approximately $130,000. <br />While lighting of these intersections is important, it has not yet been proposed that this <br />project be initiated. <br /> <br />Huseby Storm Sewer Project <br /> <br />This project would m.ke drainage from the north side of Highway #I0, west of Ramsey <br />Boulevard N.W., and drain it to the Mississippi River through the Huseby property which <br />is the future site of the Mississippi West Regional Park. The drainage area north of this <br />location had experienced flooding in the mid-1980's. The estimated cost of the project is <br />roughly estimated to be $400,000. There has been a commitment by the Department of <br />Transportation to cost share in this project as it will be draining a portion of Trunk <br />Highway # 10. <br /> <br /> <br />